No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

11 results for “Ford Motor Company”

  1. Company document · Union Carbide documents · August 25, 1980

    Industrial Hygiene Monitoring for Asbestos: Insulation Stripping and Bagging at Bldg. 777, Addressed to R. F. Painter (1980)

    Monitoring form for C. Miller: two samples (0.1 and 5 µm/cm3) during insulation stripping, 8/25/80 Monitoring form for D. C. Shamblin: two samples (0.1 and 0.2) during insulation stripping, 8…

  2. Company document · Union Carbide documents · July 3, 1980

    Industrial Hygiene Monitoring for Asbestos: Cooling Tower Insulation Stripping, Building 789, to R. F. Painter (1980)

    Monitoring form for C. Miller, A.M. sample .3, stripping insulation, 108 minutes (UCC 024714) Monitoring form for D. C. Shamblin, A.M. sample .7, stripping insulation, 108 minutes (UCC 024715) Monitoring form for R. R…

  3. Company document · Union Carbide documents · July 3, 1980

    Industrial Hygiene Monitoring for Asbestos: Cooling Tower Insulation Stripping, Building 789, to R. F. Painter (1980)

    Monitoring form for D. C. Shamblin, A.M. sample stripping insulation, .7 fibers >5 µm/cm3, 108 minutes (UCC 016635) Monitoring form for C. Miller, A.M. sample stripping insulation, .3 fibers >5 µm/cm3, 108…

  4. Company document · Union Carbide documents · April 26, 1982

    Industrial Hygiene Monitoring for Asbestos Reports to R. F. Painter (Shamblin and Templeton, Bldg. 706) and to W. T. Shelton (Greenlee) (1982)

    Monitoring report (W-1315, April 26, 1982) to R. F. Painter for D. C. Shamblin, personal and area samples, Bldg. 706, UCC 024326 Monitoring report (W-1315, April 26, 1982) to R. F. Painter for R…

  5. Company document · Union Carbide documents · April 22, 1981

    Industrial Hygiene Monitoring for Asbestos: Insulator Pipe Stripping at Bldg. 773 Tank Pad, J. F. Chandler and D. C. Shamblin, to R. F. Painter (1981)

    Monitoring report for J. F. Chandler, 04/20/81, two samples (78 and 125 minutes), TWA 5 µm/cm3 Monitoring report for D. C. Shamblin, 04/20/81, two samples (85 and 123 minutes), TWA .1…

  6. Company document · Union Carbide documents · August 1980

    Ruth Clise to R. F. Painter: Industrial Hygiene Monitoring Reports for Asbestos During Insulation Stripping in Bldg. 777 (1980)

    …E. Templeton, Bldg. 777 elevator shaft area, 8/25/80, bagging insulation (UCC 016638) Monitoring report (W-1078) for D. C. Shamblin, same location, 8/25/80, stripping insulation (UCC 016638A) Monitoring report (W-1078) for…

  7. Company document · Union Carbide documents · 1980

    Union Carbide Industrial Hygiene Monitoring for Asbestos Forms, Bldg. 777 Insulation Stripping, Including Reports to R. F. Painter (1980)

    …sampling times, time-weighted averages, the OSHA allowable exposure, and comments on wetting insulation and wearing respirators. The August 1980 forms for D. C. Shamblin and R. E. Templeton list time-weighted averages of 4.1…

  8. Company document · Union Carbide documents · July 3, 1980

    Industrial Hygiene Monitoring for Asbestos: Cooling Tower Insulation Stripping, Building 789, to R. F. Painter (1980)

    Monitoring form for C. Miller, stripping insulation, A.M. sample .3 fibers >5 µm/cm3, 108 minutes (UCC 024251) Monitoring form for D. C. Shamblin, stripping insulation, A.M. sample .7 fibers >5 µm/cm3, 108…

  9. Company document · Union Carbide documents · April 22, 1981

    Industrial Hygiene Monitoring for Asbestos: Insulator Stripping Pipe Insulation at Bldg. 773, Reports to R. F. Painter (1981)

    Monitoring report for D. C. Shamblin, 04/20/81, samples of .1 and .2 fibers >5 µm/cm3, TWA .1 (UCC 024742) Monitoring report for J. F. Chandler, 04/20/81, both samples 5 µm/cm3…

  10. Company document · Union Carbide documents · August 1980

    Handwritten Asbestos Fiber Count Calculations for D. C. Shamblin and R. E. Templeton, Bldg. 777 (1980)

    One handwritten page headed "Asbestos Calculation" for Bldg. 777. It works out fiber counts per microscope field for two named individuals, D. C. Shamblin and R. E. Templeton, and converts them to fibers longer than 5 µm per cm³ and to time-weighted…

  11. Company document · Union Carbide documents · April 26, 1982

    Mark E. Bell to R. F. Painter on Industrial Hygiene Asbestos Monitoring of Insulation Stripping in Building 706, D. C. Shamblin and R. E. Templeton (1982)

    Monitoring form for D. C. Shamblin: personal sample 1.2 and area sample 1.0 fibers >5 µm/cc, 04/21/82 (UCC 016616) Monitoring form for R. E. Templeton: personal sample 0.9 fibers >5…