  1. Company document · Union Carbide documents · July 3, 1973

    R. T. Marold to E. W. Krummel on Asbestos Formulations and Bulk Handling at the Bound Brook Plant (1973)

    Internal Union Carbide Chemicals and Plastics memo restating Manufacturing's understanding of the objective for asbestos formulations in the molding material business. It describes a plan to substitute pelleted asbestos and CaCO3 for the Carey asbestos…

  2. Company document · Union Carbide documents · June 17, 1986

    Internal Memo to W. P. Fethke on Removal of Asbestos Pipe Insulation from Lab 77L, Tarrytown (1986)

    Internal Union Carbide memo dated 17 June 1986 about Allied shop personnel removing pipe insulation believed to be asbestos from Lab 77L at Tarrytown. The writer says the work was not done safely in two instances…

  3. Company document · Union Carbide documents · April 21, 1975

    H. B. Rhodes to William H. Mortonson (Flintkote) Transmitting Information on California Marks Bill SB 2419 Asbestos Spray Ban (1975)

    …B. Rhodes to Flintkote's William Mortonson enclosing information discussed the previous Friday, which Union Carbide was sending to selected California customers. The attachment summarizes California SB 2419 (the Marks Bill), which bans spraying of substances…

  4. Company document · Union Carbide documents · July 10, 1968

    E. J. Markiewicz to Dr. S. Chwastiak on Polyox and Tergitol TP-9 Treated S-G200 Asbestos for Drilling Fluid Application (1968)

    Research memo reporting wet-opening tests of S-G200 asbestos treated with Polyox WSRN-10 and Tergitol TP-9 for use as a drilling fluid additive. It states that the Polyox-treated asbestos opened no better than untreated asbestos and that Tergitol…

  5. Company document · Union Carbide documents · July 1, 1987

    S. B. Kovach to P. R. Desai Transmitting South Charleston Plant SHARE Inspection Results, with Handwritten Inspection Reports (1987)

    A July 1, 1987 cover letter from SHARE Coordinator S. B. Kovach to P. R. Desai forwarding findings of a SHARE inspection held that day. It sets goals of addressing all deficiencies within 90 days and sending 30-day updates, and includes a progress…

  6. Company document · Union Carbide documents · April 1984

    Provisions for Asbestos Material Removal and Disposal Safety, South Charleston Plant Maintenance Safety Manual (1984)

    A seven-page plant safety provision (section XVIII) setting out procedures for removing and disposing of old asbestos insulation at the South Charleston plant. It covers responsibilities, respirators, work-area precautions, wet cleanup, clothing and…

  7. Company document · Union Carbide documents · August 14, 1989

    D. R. Schoen, Notice of Intention to Renovate Asbestos-Containing Reflux Drum at Texas City Plant, Building 94 (1989)

    A handwritten-in form (Plant Procedure SH-5.6, Attachment #1) giving notice of an emergency removal of friable asbestos material from the #2 SRC reflux drum at Building 94 at the Texas City Plant. The form records an estimated area, an estimated age…

  8. Company document · Union Carbide documents · March 18, 1977

    Harrison B. Rhodes to Assemblyman Walter J. Kozloski on New Jersey Assembly Bill A-3009 Regulating Asbestos Coatings (1977)

    Letter from Union Carbide's Technology Manager to a New Jersey assemblyman commenting on Assembly Bill A-3009, which would regulate asbestos coatings after the Howell Township schools matter. It agreed that unbound sprayed coatings should…

  9. Company document · Union Carbide documents · March 19, 1979

    R. J. Sexton, M.D. to E. C. Shipley on Annual Medical Surveillance for Asbestos Workers at Institute Plant (1979)

    Internal correspondence from the Institute Plant Medical Director correcting what he had told Shipley by telephone about annual medical surveillance for asbestos workers. He wrote that, as he read the asbestos standard, workers need a preplacement…

  10. Company document · Union Carbide documents · January 29, 1974

    Safety Department to F. H. Larrison on the Management Safety Audit of King City (1974)

    Internal correspondence from the Mining and Metals Division Safety department to the King City manager reporting the audit team's consensus comments on the King City operation's December 10, 1973 management safety audit. It lists numbered…

  11. Company document · Union Carbide documents · December 28, 1964

    Compilation: C. E. Metten Trip Report on Asbestos Flooring Felts (1964) and R. G. Woolery Monthly Summary Report on Asbestos Research and Development (1967)

    The exhibit combines two Union Carbide documents. Pages 1-2 are a December 28, 1964 trip report by C. E. Metten on a visit to the Union Carbide Nuclear Division Research Center to discuss asbestos flooring…

  12. Company document · Union Carbide documents · November 7, 1986

    J. F. Dodd to D. A. Gosselin and Others Transmitting the South Charleston Plant Insulation Asbestos Upgrade Outline of Project (1986)

    Cover memo dated November 7, 1986 transmitting for review an Outline of Project for a plantwide asbestos insulation upgrade at the South Charleston, WV plant, described as a high-priority Safety/Health Program. The attached outline describes the…

  13. Company document · Union Carbide documents · October 3, 1979

    A. J. Montero to E. E. Baez and Others on Using Haveg and Chemtite Asbestos-Resin Piping in the Ponce Plant Cumene Unit (1979)

    Memorandum responding to a question from Cumene Unit personnel at the Ponce Plant about using Haveg or Chemtite piping, which is made by molding asbestos fibers with resin, in place of Teflon-lined steel piping. It reviewed chemical resistance and…

  14. Company document · Union Carbide documents · June 11, 1973

    B. L. Ingalls Call Report on Telecon with John Rauch, Georgia-Pacific Bestwall Gypsum, About EPA Asbestos Regulations and OSHA Citations (1973)

    Call report of a telephone interview by B. L. Ingalls with John Rauch, plant manager of Georgia-Pacific's Bestwall Gypsum Division in Akron, NY. Ingalls informed him of the April EPA asbestos regulations, and Rauch reported an OSHA letter citing the…

  15. Company document · Union Carbide documents · October 3, 1986

    W. J. Vincent to C. H. Hancock on Equipment Needs for Asbestos Monitoring (1986)

    Memo from W. J. Vincent to C. H. Hancock reviewing the Industrial Hygiene Group's needs under the new asbestos standards (1910.1001 and 1926). It states that technicians counting fibers by the NIOSH 7400 method must be trained and certified, that…

  16. Company document · Union Carbide documents · August 14, 1972

    J. E. Neff Project Report on Airborne Asbestos Fibers During Addition of Calidria to Polysulfone Resin, Building 30, Marietta Plant (1972)

    Project report (Project No. 910C10) on air sampling at the Marietta Plant, Building 30, on May 17, 1972, while Calidria asbestos (RG 101) was added to polysulfone resin through an exhaust-hooded feed hopper. It reports fiber counts below the 5…

  17. Company document · Union Carbide documents · September 29, 1980

    J. L. Myers to R. E. Byrne, Jr. and Others Transmitting Summary of the Asbestos Business, 1980 and 1981 (1980)

    A cover memo from J. L. Myers enclosing a summary of the asbestos business for 1980 and 1981 that he prepared for George Adams, dated 9/19/80. The summary covers record sales, markets (floor tile, drilling mud, resin grade, export), King City mill…

  18. Company document · Union Carbide documents · April 1, 1980

    H. B. Rhodes to Asbestos SPU Distribution on Status of Asbestos Regulatory Matters, with Presentation Text and Figures (1980)

    Internal Metals Division cover memo from Harrison B. Rhodes dated April 1, 1980, enclosing the text and figures of his March 28, 1980 presentation to the Asbestos SPU Committee on asbestos regulatory matters, plus suggested changes to the asbestos…

  19. Company document · Union Carbide documents · November 16, 1973

    H. B. Rhodes to W. C. Thurber on EPA Proposed Effluent Limitations Guidelines for the Asbestos Manufacturing Point Source Category (1973)

    Internal Union Carbide letter-memo reviewing EPA's proposed effluent limitations guidelines for water discharges from the asbestos manufacturing point source category. It states that floor tile is the only covered end use where UCC was…

  20. Company document · Union Carbide documents · October 23, 1986

    Technical Center Supervisors' Incident Report on Asbestos-Containing Insulation Debris in Building 770, Area 137 Laboratory (1986)