5,238 results for “Union Carbide Corporation”, page 174 of 262
-
Company document · Union Carbide documents · April 15, 1982
Gordon L. Dickson Call Report on Chevron U.S.A., Inc. (San Francisco) Regarding HPO in Sealers and Roof Coatings (1982)
Customer call report of a 4/15/82 visit by salesman Gordon L. Dickson (with Tom Norris) to Chevron U.S.A., Inc. in San Francisco, interviewing buyer Jens V. Jensen. It reports that HPO was approved for Chevron's driveway sealers in November 1979 but…
-
Company document · Union Carbide documents · July 16, 1980
G. F. Hurley to B. D. Tissue on Asbestos Monitoring 1965-70 for the Jennings Deitz Case, with Attached Fred Williams Air Sampling Memo (1980)
Internal letter in which the Technical Center industrial hygienist reported, for the Jennings Deitz case, that he found no records of asbestos exposure monitoring of insulator J. D. Deitz. It attached an earlier memo by Fred Williams reporting April…
-
Company document · Union Carbide documents · November 11, 1986
P. D. Sherman to All R/D Personnel: Safety Alert on Asbestos in the Laboratory (1986)
Internal Union Carbide safety alert from the R/D Health, Safety/Environmental Affairs manager to all R/D personnel about asbestos-containing materials in the laboratory. It reports OSHA's reduction of the permissible exposure limit…
-
Company document · Union Carbide documents · June 1984
H. C. Lewinsohn to S. Baye, J. B. Browning and Others Transmitting Revised Draft OSHA Asbestos Testimony on Medical Surveillance (1984)
A June 1984 internal Union Carbide memo from Dr. H. C. Lewinsohn transmits a revised draft of testimony he proposed to submit on July 12, 1984 at the OSHA informal rulemaking hearing on occupational exposure to…
-
Company document · Union Carbide documents · October 11, 1985
Workplace Environment Monitoring Field Data Sheet: Air Samples During Asbestos Stripping, No. 2 Evaporator, Bldg. 228 (1985)
A copy of a Workplace Environment Monitoring Field Data Sheet for an asbestos project, dated 10-11-85, covering stripping of asbestos from the No. 2 evaporator in Bldg. 228 with signs up and 3M disposable masks. It records two area/ambient air…
-
Company document · Union Carbide documents · March 20, 1981
R. J. Sexton to E. C. Shipley Requesting Names of Construction Department Employees Exposed to Asbestos or Silica, Institute Plant (1981)
Internal correspondence from the Institute Plant medical director to E. C. Shipley, subject "Medical Surveillance for Asbestosis - 1981 Survey." It asked for the names and payroll numbers of Construction Department employees who had or were having…
-
Company document · Union Carbide documents · August 22, 1979
K. G. Townsend to Distribution on OSHA Inspection of Contractor Brown & Root at Brownsville Plant, with Attached Inspection Summary (1979)
A cover memo of August 22, 1979 forwards a summary of an OSHA inspection of Union Carbide's contractor Brown & Root at the Brownsville, Texas plant and says no citations were given. The attached August 16…
-
Company document · Union Carbide documents · November 14, 1973
Industrial Hygiene Department Preliminary Report on Asbestos Gasket Cutting in Salvage Stores, Bldg. 281, Plant 515, with Dust Study Sheets (1973)
A preliminary industrial hygiene report dated 11/14/73 on monitoring asbestos gasket cutting operations in Salvage Stores, Bldg. 281, Plant 515. It reports that personnel and general area samples were all below one fiber per cc longer than five…
-
Company document · Union Carbide documents · September 6, 1984
R. R. Rankin to General Occupational Health Committee Transmitting OSHA Special Emphasis Program for Asbestos, with Handwritten Notes (1984)
Internal Union Carbide memo of September 6, 1984 from R. R. Rankin forwarding OSHA Instruction CPL 2.60A, the revised National Emphasis Program for asbestos inspections. Rankin says the directive requires each OSHA Area Director to…
-
Company document · Union Carbide documents · June 22, 1977
R. A. Huber to Distribution List on Guidance for Compliance with EPA Asbestos Regulation (1977)
Internal correspondence from the Maintenance Operations Manager of Chemicals and Plastics transmitting an outline for complying with the EPA asbestos regulation (40 CFR 61) on removal and disposal of asbestos-containing insulation and on notifying…
-
Company document · Union Carbide documents · November 1971
Bakelite BMG-0750 Natural Electrical Phenolic Molding Material Data Sheet (1971)
A one-page product data sheet for Bakelite BMG-0750 Natural, a mineral-filled phenolic molding material for electrical insulation. It describes the material and lists fabrication, mechanical, electrical and miscellaneous properties. The sheet…
-
Company document · Union Carbide documents · July 9, 1984
H. C. Lewinsohn Cover Note to 'Darrell' and Draft OSHA Hearing Presentation on Medical Examinations Required for Asbestos Workers (1984)
A handwritten note from Hilton C. Lewinsohn to 'Darrell' dated July 9, 1984, enclosing his submission to OSHA on asbestos and asking for copies to be available at the hearings. It is followed by a draft presentation for the OSHA informal rulemaking…
-
Company document · Union Carbide documents · March 20, 1985
M. W. Sue to R. A. Bleidt on Offering Asbestos Identification and Personal Monitoring Analysis Through Testing and Research Service (1985)
Memo from Marty Sue to Bob Bleidt, with copies to several others, responding to Bleidt's idea about analyzing asbestos in ambient environments by TEM. Sue reported what he learned about available equipment and the OSHA/NIOSH personal monitoring…
-
Company document · Union Carbide documents · February 24, 1984
D. F. Kapral to W. C. Thurber on Prefeasibility Capital Estimates for a Plant to Produce Coalinga Alteration Products (1984)
Kapral transmitted a prefeasibility study, prepared by Darden Holt, on the capital and operating costs of a plant to calcine Coalinga ore into non-asbestos forsterite. The memo gave estimated capital costs of $14.6MM, or $12.6MM if iron was not…
-
Company document · Union Carbide documents · January 26, 1973
D. E. Furlani Report on Inspecting a Rail Shipment of Shrink-Wrapped Asbestos Pallets at Georgia-Pacific, Akron, New York (1973)
Trip report (Report No. 73-T-7) on an inspection on January 18, 1973 of a rail shipment of palletized asbestos SG-210 from King City that arrived at the Georgia-Pacific plant in Akron, New York. Two pallets had been shrink-wrapped in polyethylene…
-
Company document · Union Carbide documents · April 6, 1987
C. C. Neely to Task Group on Minutes of March 17, 1987 Meeting on Phaseout of Asbestos-Containing Materials, Chemicals and Plastics Group (1987)
Memo with an executive summary and action items from the March 17, 1987 meeting of the task group on phasing out asbestos-containing materials in the Chemicals and Plastics (C&P) Group's work places. It covers the January 1, 1989 purchase cutoff, an…
-
Company document · Union Carbide documents · April 16, 1980
A. L. Barefoot to R. C. Glock and D. E. Hockaday on Paint and Sandblast Personnel Exposure at the Brownsville Plant (1980)
Internal correspondence summarizing an April 16, 1980 meeting on paint and sandblasting personnel exposure at the Brownsville, Texas site. It lists an action plan covering paint lead and chromium content, rearranging the sandyard/paint facility,…
-
Company document · Union Carbide documents · March 23, 1979
H. K. Jackson to K. E. Helminiak and Others on Outline for Presentation of Strategic Plans, with Attached Calidria Market Pages (1979)
…Division internal memo transmitting an outline for presenting strategic plans to the management committee, noting it could help prepare for the upcoming asbestos and calcium carbide planning sessions. The attachments are the outline (dated March 19…
-
Company document · Union Carbide documents · January 8, 1979
J. B. Leverton to H. R. Schulz on OSHA Complaint About Restrooms in Bldg. 239, Texas City Plant (1979)
…the Leverton memo of Jan. 8, 1979 (UCTC 20886) Letter from R. Davis Layne, Area Director, OSHA Houston South Area Office, to Union Carbide Corp., Texas City, Jan. 2, 1979, on Complaint #267 (UCTC 20887-20888)
-
Company document · Union Carbide documents · November 7, 1986
J. F. Dodd to D. A. Gosselin and Others Transmitting the South Charleston Plant Insulation Asbestos Upgrade Outline of Project (1986)
A November 7, 1986 transmittal memo from Joseph F. Dodd circulating the Outline of Project for a plantwide asbestos insulation upgrade at the South Charleston Plant, with a handwritten note asking who would perform the work. The attached outline…