32 results for “Ford Motor Company”, page 2 of 2
-
Company document · Union Carbide documents · July 3, 1980
Industrial Hygiene Monitoring for Asbestos: Cooling Tower Insulation Stripping, Building 789, to R. F. Painter (1980)
Monitoring form for C. Miller, A.M. sample .3, stripping insulation, 108 minutes (UCC 024714) Monitoring form for D. C. Shamblin, A.M. sample .7, stripping insulation, 108 minutes (UCC 024715) Monitoring form for R. R…
-
Company document · Union Carbide documents · July 3, 1980
Industrial Hygiene Monitoring for Asbestos: Cooling Tower Insulation Stripping, Building 789, to R. F. Painter (1980)
Monitoring form for D. C. Shamblin, A.M. sample stripping insulation, .7 fibers >5 µm/cm3, 108 minutes (UCC 016635) Monitoring form for C. Miller, A.M. sample stripping insulation, .3 fibers >5 µm/cm3, 108…
-
Company document · Union Carbide documents · April 26, 1982
Industrial Hygiene Monitoring for Asbestos Reports to R. F. Painter (Shamblin and Templeton, Bldg. 706) and to W. T. Shelton (Greenlee) (1982)
Monitoring report (W-1315, April 26, 1982) to R. F. Painter for D. C. Shamblin, personal and area samples, Bldg. 706, UCC 024326 Monitoring report (W-1315, April 26, 1982) to R. F. Painter for R…
-
Company document · Union Carbide documents · April 22, 1981
Industrial Hygiene Monitoring for Asbestos: Insulator Pipe Stripping at Bldg. 773 Tank Pad, J. F. Chandler and D. C. Shamblin, to R. F. Painter (1981)
Monitoring report for J. F. Chandler, 04/20/81, two samples (78 and 125 minutes), TWA 5 µm/cm3 Monitoring report for D. C. Shamblin, 04/20/81, two samples (85 and 123 minutes), TWA .1…
-
Company document · Union Carbide documents · August 1980
Ruth Clise to R. F. Painter: Industrial Hygiene Monitoring Reports for Asbestos During Insulation Stripping in Bldg. 777 (1980)
…E. Templeton, Bldg. 777 elevator shaft area, 8/25/80, bagging insulation (UCC 016638) Monitoring report (W-1078) for D. C. Shamblin, same location, 8/25/80, stripping insulation (UCC 016638A) Monitoring report (W-1078) for…
-
Company document · Union Carbide documents · 1980
Union Carbide Industrial Hygiene Monitoring for Asbestos Forms, Bldg. 777 Insulation Stripping, Including Reports to R. F. Painter (1980)
…sampling times, time-weighted averages, the OSHA allowable exposure, and comments on wetting insulation and wearing respirators. The August 1980 forms for D. C. Shamblin and R. E. Templeton list time-weighted averages of 4.1…
-
Company document · Union Carbide documents · July 3, 1980
Industrial Hygiene Monitoring for Asbestos: Cooling Tower Insulation Stripping, Building 789, to R. F. Painter (1980)
Monitoring form for C. Miller, stripping insulation, A.M. sample .3 fibers >5 µm/cm3, 108 minutes (UCC 024251) Monitoring form for D. C. Shamblin, stripping insulation, A.M. sample .7 fibers >5 µm/cm3, 108…
-
Company document · Union Carbide documents · April 22, 1981
Industrial Hygiene Monitoring for Asbestos: Insulator Stripping Pipe Insulation at Bldg. 773, Reports to R. F. Painter (1981)
Monitoring report for D. C. Shamblin, 04/20/81, samples of .1 and .2 fibers >5 µm/cm3, TWA .1 (UCC 024742) Monitoring report for J. F. Chandler, 04/20/81, both samples 5 µm/cm3…
-
Company document · Union Carbide documents · August 1980
Handwritten Asbestos Fiber Count Calculations for D. C. Shamblin and R. E. Templeton, Bldg. 777 (1980)
One handwritten page headed "Asbestos Calculation" for Bldg. 777. It works out fiber counts per microscope field for two named individuals, D. C. Shamblin and R. E. Templeton, and converts them to fibers longer than 5 µm per cm³ and to time-weighted…
-
Company document · Union Carbide documents · April 26, 1982
Mark E. Bell to R. F. Painter on Industrial Hygiene Asbestos Monitoring of Insulation Stripping in Building 706, D. C. Shamblin and R. E. Templeton (1982)
Monitoring form for D. C. Shamblin: personal sample 1.2 and area sample 1.0 fibers >5 µm/cc, 04/21/82 (UCC 016616) Monitoring form for R. E. Templeton: personal sample 0.9 fibers >5…
-
Company document · Union Carbide documents
Guide: Repair and Removal of Asbestos Insulation, Copy Received by D. A. Gosselin (1984)
…It covers dry and wet stripping, work-area enclosure, dust extraction, protective equipment and waste disposal. The first page carries a received stamp for D. A. Gosselin dated May 10, 1984, and handwritten routing and cc…
-
Company document · Union Carbide documents
Union Carbide Calidria Customer Call Reports and Related Papers on Chevron, Including Chevron Research Comments to EPA (1978-1983)
Chevron Research Company card for Zoltan Saary, Research Chemist, with exhibit sticker UC-248 Call report, Chevron U.S.A., San Francisco, 4/15/82, G. L. Dickson with Tom Norris; HPO in driveway sealers and…