1,791 results for “Union Carbide Corporation”, page 21 of 90
-
Company document · Union Carbide documents · October 28, 1986
T. E. Hanning to Recipient on Review of South Charleston Plant Procedures for Removal and Disposal of Asbestos Materials (1986)
Memorandum from T. E. Hanning reviewing updates to the South Charleston plant's 514 Maintenance Department procedure for handling and disposing of asbestos insulation, following the July 1986 OSHA revision. It sets out the revised exposure limit and…
-
Company document · Union Carbide documents · March 25, 1983
Industrial Hygiene Results: Insulation Sampling on Water Tank T-1098, Esters Area, by H. G. Kuntz and K. E. Williams (1983)
One-page industrial hygiene report dated March 25, 1983, on samples of loose and rigid insulation taken on March 23, 1983 from water tank T-1098 near the Esters tower. Chemical microscopy found no asbestos in either sample, and the report…
-
Company document · Union Carbide documents · April 19, 1985
V. D. Dutcher to Plant Managers on Community Hazard Communication, with Hazardous Chemical Lists and OSHA Guidance (1985)
…IARC source columns and a mineral dusts section listing asbestos IARC Monographs Supplement 4 (1982), cover and Group 1-3 classification excerpt Not sent Union Carbide List of Carcinogens and Teratogens, pages 4-9 of 9
-
Company document · Union Carbide documents · October 16, 1986
J. E. Sanders to L. E. Calvert, S. W. Clark, G. B. Elder and R. W. Engle on Recommended C&P Program to Phase Out Asbestos-Containing Materials in the Workplace (1986)
A one-page internal cover memo in which J. E. Sanders told four recipients that he had sent their recommendation on asbestos usage to Bob Perry. He thanked them for their work and said he would keep them posted as the recommendation moved through…
-
Company document · Union Carbide documents · December 14, 1983
R. A. Ream to L. D. Diggs and Others on Energy Systems Department Asbestos Handling Procedures (1983)
Memo from R. A. Ream to five named recipients, with copies to about a dozen others, shift superintendents and ES routing lists, setting two requirements for the Energy Systems (ES) Department at the South Charleston Plant. Removal of insulation…
-
Company document · Union Carbide documents · February 3, 1986
J. L. Worstell to J. R. D. on Asbestos Conditions at Plant 514, with R. G. Link's Cover Memo on the Corporate Environmental Audit of Plant 514 (1986)
Page 1 is a February 3, 1986 memo from the South Charleston Plant Environmental Protection department, signed by 'JLW', to 'Jim' about asbestos conditions at Plant 514 found in a corporate EP audit about a year and a half earlier, with a suggestion…
-
Company document · Union Carbide documents · June 22, 1987
J. E. Sanders to C. C. Neely on Placing the Asbestos Phaseout Program in the TMS Technology Manuals (1987)
Memo from J. E. Sanders to C. C. Neely replying to Neely's April 6, 1987 transmittal of Task Group meeting minutes. Sanders agreed that the asbestos phaseout program should reside in the CEO-sponsored TMS system, recommended summary statements in…
-
Company document · Union Carbide documents · March 24, 1987
R. W. Engle, Piping Technology Minutes on Replacing Asbestos with GRAFOIL in Valve and Piping Specifications (1987)
One-page Piping Technology entry prepared for inclusion in the Asbestos Task Force general meeting minutes (marked Agenda Item 4.3). It reports R. W. Engle's proposed plan to revise the valve and piping specifications to use GRAFOIL products as the…
-
Company document · Union Carbide documents · July 31, 1980
F. L. Smith to R. E. Byrne, Jr. and Others Transmitting Airborne Asbestos Counts for Labs 118 and 205, Niagara Falls (1980)
Internal Metals Division memo dated July 31, 1980, from Technical Services (Calidria Asbestos) enclosing airborne asbestos concentrations for Labs 118 and 205 at Niagara Falls. It is followed by a report cover sheet (samples taken 7/15/80,…
-
Company document · Union Carbide documents · July 3, 1980
Industrial Hygiene Monitoring for Asbestos: Cooling Tower Insulation Stripping, Building 789, to R. F. Painter (1980)
Three industrial hygiene monitoring forms dated 7/3/80 report airborne fiber results for workers stripping and bagging insulation in the basement of Building 789 (cooling tower). The A.M. samples were .7, .3 and .3 fibers >5 µm/cm3; the P.M. samples…
-
Company document · Union Carbide documents · February 1, 1988
Keith to B. Myer on Progress of the Insulation Upgrade (Glove-Bag Removal of Asbestos Pipe Insulation) at Sistersville (1988)
Handwritten note, To B. Myer, Subject: Insulation upgrade, reporting progress of the glove-bag insulation removal program Contractor log sheet, Union Carbide, Sistersville W.V., Job No. 0014, January 1988, pipe footage and man-hours by…
-
Company document · Union Carbide documents · May 19, 1989
Notice of Intention to Demolish or Renovate Asbestos-Containing Steam Header at Building 19 Drum Room, Texas City Plant (1989)
A completed Texas City Plant form (Plant Procedure I-B-8, Attachment #1) giving notice of a planned renovation of a 2-inch utility steam header to the Building 19 drum room barrel wash basin. The handwritten entries list about 12 sq ft and 9 linear…
-
Company document · Union Carbide documents · August 14, 1984
J. J. Ashworth to J. R. Dean on Winterization Lists for Area 2, South Charleston Plant, with Needed Insulation Work Lists (1984)
A one-page internal memo from J. J. Ashworth asks Area 2 operations department heads for winterization lists by 8-24-84 to prevent freeze-ups like those of 1983-84. It is followed by lists of needed pipe and equipment insulation work for several…
-
Company document · Union Carbide documents · November 24, 1981
T. P. Norris Call Report on Armstrong Cork, South Gate, CA, on Bagging SG-130 in P.E. Bags (1981)
A Metals Division customer call report of a telephone call on 11/24/81 to Earl Evans, Chief Chemist at Armstrong Cork in South Gate, CA (floor tile). The call sought to determine interest in bagging SG-130 in polyethylene bags. The report states…
-
Company document · Union Carbide documents · December 17, 1986
R. L. Foster to Distribution on Reissuing EPA Asbestos Removal Notification Reminder, with 1984 Memorandum and Notification Forms (1986)
…13, 1984 Union Carbide memo clarifying prior notification for renovation of friable asbestos, with blanket notification form letter (Form C) Law Department memo on notification of demolition or renovation of friable asbestos material under 40 CFR…
-
Company document · Union Carbide documents · June 25, 1984
H. C. Lewinsohn to Distribution Transmitting Revised Draft OSHA Asbestos Testimony, with Draft 'Medical Examinations Required for Asbestos Workers' (1984)
…1984 cover memo from Union Carbide's Assistant Corporate Medical Director circulates a revised draft of his proposed testimony for the OSHA informal rulemaking hearing on occupational exposure to asbestos and asks for comments by July…
-
Company document · Union Carbide documents · September 30, 1986
C. C. Neely to J. E. Sanders Transmitting Final Draft of C&P Program to Phase Out Asbestos-Containing Materials in the Work Place, with Attachments (1986)
Memo from C. C. Neely transmitting, for the Special Working Group, a final draft Chemicals and Plastics Group policy to phase out asbestos-containing materials in plant work places, with a January 1, 1989 purchase cut-off. It reports concerns raised…
-
Company document · Union Carbide documents · October 2, 1980
M. Gutierrez to K. G. Townsend on Brownsville Plant Heat Stress Survey (1980)
Internal memo from M. Gutierrez to K. G. Townsend transmitting results of a heat stress survey taken the prior month at the Brownsville plant. It lists eight explanatory points for the ACGIH permissible heat exposure threshold limit values and…
-
Company document · Union Carbide documents · December 14, 1984
G. C. Merz to EPA Enforcement Division 3 Transmitting Notice of Intent to Remove Friable Asbestos Insulation (1984)
Letter from G. C. Merz of Union Carbide's South Charleston, W. Va. site to the EPA Enforcement Division in Philadelphia, enclosing a notice under 40 CFR 61, Subpart B, Section 61.22(d) of planned…
-
Company document · Union Carbide documents · July 26, 1983
G. L. Dickson to J. T. Kelly on 1983 First-Half Sales of Silica Treated Calidria Asbestos RG-244 and SX-24 (1983)
Internal memo summarizing first-half 1983 sales of the silica treated asbestos products RG-244 and SX-24 against budget, with export, commercial customer and distributor breakdowns. It reports sales below budget and attributes the shortfall to lost…