- Sent to: E. C. Shipley
- Organization: Union Carbide Corporation, Chemicals and Plastics, Technical Center IH/EP
- Clear filters
6 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · March 5, 1979
G. F. Hurley to E. C. Shipley on Medical Examinations Under the OSHA Asbestos Standard, with OSHA Program Directive #300-16 (1979)
A March 5, 1979 internal letter from industrial hygienist G. F. Hurley to E. C. Shipley at the Institute Plant forwarding an OSHA administrative interpretation of the medical examination requirements of the asbestos standard. The letter states that…
-
Company document · Union Carbide documents · March 29, 1979
W. F. Blythe, Jr. to D. L. Johnson, E. C. Shipley and E. J. Tawney on Asbestos Monitoring of Insulators at Institute (1979)
Internal memo reporting air sampling of construction insulators removing asbestos-containing insulation from a 3-inch steam line at the Institute, West Virginia, plant on March 17 and 19, 1979. It reported fiber concentrations of 0.7 to 3.4…
-
Company document · Union Carbide documents · March 29, 1979
W. F. Blythe, Jr. to D. L. Johnson, E. C. Shipley and E. J. Tawney on Asbestos Monitoring of Insulators at Institute, West Virginia (1979)
Internal industrial hygiene report on personal and area air sampling for asbestos during removal of insulation from a 3-inch steam line at the Institute, West Virginia plant on March 17 and 19, 1979. Results ranged from 0.2 to 3.4 fibers/cc for…
-
Company document · Union Carbide documents · March 3, 1980
Technical Center IH/EP to D. L. Johnson and Others on Asbestos Monitoring at Institute #2 Powerhouse (1980)
Internal Union Carbide memo reporting a February 20, 1980 survey of employee exposure to airborne asbestos fibers during removal of boiler insulation at the #2 Powerhouse at Institute, West Virginia. Personal air samples measured 0.2…
-
Company document · Union Carbide documents · March 3, 1980
Technical Center Industrial Hygiene Report on Asbestos Monitoring During Boiler Insulation Removal at Institute #2 Powerhouse (1980)
Internal correspondence reporting personal air sampling of employees during removal of insulation from a boiler at the #2 Powerhouse at Institute, West Virginia, on February 20, 1980. Sample concentrations ranged from 0.2 to 0.8 f/cc, which the memo…
-
Company document · Union Carbide documents · December 19, 1979
G. F. Hurley to C. W. Carman and Others on an Informational Slide Program on Asbestos (1979)
Internal Union Carbide memo from the Technical Center industrial hygienist announcing a 20-minute slide presentation with taped commentary on asbestos toxicity and safe handling. It says the Industrial Hygiene group revised a Johns-Manville presentation…