8,265 results for “Union Carbide Corporation”, page 92 of 414
The filters are being updated and will be back in a few minutes.
-
Company document · Union Carbide documents · January 19, 1968
Compilation: McDaniel to J. A. Riddle on Chrysotile and Mesothelioma, with Nature Article, Dernehl and Lane Asbestos Toxicology Report, and 1966 Sales Memo (1968)
…limit Nature, vol. 217, Jan. 13, 1968, 'More on Asbestosis' (British Advisory Panel memorandum), with received stamp and handwritten marks Union Carbide 'Asbestos Toxicology Report' by C. U. Dernehl, M.D. and K. S. Lane, M…
-
Company document · Union Carbide documents · September 24, 1974
E. J. Kleber Report of Call on Shell Oil, Traverse City, Michigan, on Air Sampling and Handling of Calidria Pellets at Drilling Rigs (1974)
Report of a call on Shell Oil in the Traverse City, Michigan area, where air samples were taken at three Shell drilling sites and a warehouse during the addition of NGSV to drilling muds. It records the Shell regional industrial hygienist's comments…
-
Company document · Union Carbide documents
Linde Division Asbestos Memos on the 1983 OSHA Emergency Standard, Speedway Fiber Counts, and Vermiculite Insulation (1983-1987)
Compilation of Union Carbide Linde Division papers from 1983 and 1987. The 1983 papers cover OSHA's Emergency Temporary Standard lowering the asbestos exposure limit, asbestos in acetylene cylinder filler, and fiber counts at the Speedway…
-
Company document · Union Carbide documents · November 22, 1983
H. C. Lewinsohn to H. B. Rhodes on Asbestos Toxicology and the IRDA Genotoxicity Item (1983)
Internal Union Carbide memo in which the Assistant Corporate Medical Director comments on an IRDA item, "Further Evidence that Asbestos is not Genotoxic." He says the in vitro findings cannot be related to human exposure, that…
-
Company document · Union Carbide documents · December 3, 1969
J. E. Skvarla to R. E. Byrne and Others Transmitting Technical Service Report on Repulping Calidria Asbestos Pellets for Nalco Chemical Company (1969)
A December 1969 internal Union Carbide cover memo from J. E. Skvarla forwards a November 21, 1969 Technical Service Report prepared for Nalco Chemical Company on aqueous repulping of Calidria pelletized asbestos. The report describes continuous…
-
Company document · Union Carbide documents
Asbestos Pipe Insulation Removal at the Tarrytown IBM Building and Westchester Airport Hangar D: Contractor Quotes, Notices and Memos (1983-1984)
United Painting Co. proposal to Union Carbide, Tarrytown, to remove about 560 sq. ft. of pipe insulation at the IBM building, $4,875 (Feb. 1, 1984) B.F. O'Reilly to Gerard W. Kottman on removing…
-
Company document · Union Carbide documents · June 12, 1990
Texas City Plant Notice of Intention to Remove Asbestos Transite Roofing, Prepared by Todd Lowery (1990)
Page 3 of 3 of Plant Procedure SH-5.6, Attachment #1: a Texas City Plant form giving notice of intention to demolish or renovate a structure containing asbestos material. The handwritten entries describe removal of transite roofing above burner…
-
Company document · Union Carbide documents · July 24, 1973
W. C. Thurber to F. H. Larrison, Jr. on Deferring Coverall Service for King City Employees (1973)
Letter from W. C. Thurber to F. H. Larrison, Jr., with J. F. Emerson and J. W. Rawlings also listed, about a coverall service for all employees at an annual cost of $5,000 that was discussed during his visit the previous week. Thurber suggested…
-
Company document · Union Carbide documents · August 19, 1987
S. B. Kovach to J. C. Ketcham Transmitting SHARE Safety Inspection Results, South Charleston Plant (1987)
Letter from the South Charleston Plant SHARE coordinator to J. C. Ketcham forwarding findings from a SHARE inspection held August 19, 1987. It sets goals of addressing all deficiencies within 90 days and sending 30-day progress updates. The attached…
-
Company document · Union Carbide documents · June 6, 1986
W. A. Bagot to J. C. Soviero on Replacing Asbestos Sealants with GRAFOIL Flexible Graphite, with GRAFOIL Fluid Sealing Brochure (1986)
…C. Soviero urging Union Carbide's chemical plants to replace asbestos packing and gasketing with GRAFOIL flexible graphite. It reports that the company's own chemical plants said they would keep using asbestos as long as…
-
Company document · Union Carbide documents · July 20, 1978
L. T. Windel to W. W. McManus and R. C. Glock on Monitoring of Contract Personnel (1978)
Internal correspondence from the Brownsville, Texas, Chemicals and Plastics office reporting comments by Jim Murray and Joe Triplett on how to handle industrial hygiene monitoring and liability for contractor employees' exposure. It lists six points…
-
Company document · Union Carbide documents · October 8, 1979
L. W. Phair to Plant Staff on Asbestos Insulation Disposal at the South Charleston Plant (1979)
Internal correspondence dated October 8, 1979, from L. W. Phair to ten plant staff members about disposal of asbestos insulation at the South Charleston Plant. It states that asbestos insulation must go in dumpsters taken to Fillmont, not regular…
-
Company document · Union Carbide documents · March 2, 1987
C. C. Neely to L. E. Calvert and Task Group Members on Phaseout of Asbestos-Containing Materials in Chemicals and Plastics Group Work Places, with Attachments (1987)
A March 2, 1987 Union Carbide Central Engineering memo from C. C. Neely announced that the Chemicals and Plastics Group's program to phase out asbestos-containing materials in its work places had been endorsed. It…
-
Company document · Union Carbide documents · February 11, 1985
W. L. Thomas to W. E. Ballard and Others Calling a Meeting on the Asbestos Insulation Replacement Project, with J. G. Roy's No. 2 Steam Plant Proposal (1985)
A February 11, 1985 memorandum from W. L. Thomas called a February 21, 1985 meeting to plan an asbestos insulation replacement project at the South Charleston plant and attached a December 27, 1984 proposal by J. G. Roy. Roy's proposal outlined a…
-
Company document · Union Carbide documents · May 10, 1982
Randy Noble to Building Craft, Mechanical Craft and Construction Superintendents on Asbestos in Air-Core Insulation (1982)
Union Carbide Central Engineering memo, Air-Core Insulation - Asbestos, dated May 10, 1982, with handwritten notes (UCC 017286) Plant Engineering, May 10, 1984, p. 13, 'OSHA Report' column on proposed revisions to the asbestos standard, with…
-
Company document · Union Carbide documents · August 18, 1971
J. W. Rawlings to J. L. Myers on Meeting the 1971 Asbestos Sales Forecast (1971)
Internal correspondence from J. W. Rawlings to J. L. Myers reviewing the Asbestos Business's financial position through July 1971. It reported a $77,000 loss year-to-date through June and urged Myers and his staff to meet the revised 1971 sales…
-
Company document · Union Carbide documents · June 24, 1987
S. B. Kovach to L. C. Stewart Transmitting South Charleston Plant SHARE Inspection Results, with Audit Team Reports (1987)
A June 24, 1987 cover letter from the South Charleston Plant SHARE Coordinator to L. C. Stewart forwarding findings of a SHARE safety inspection held that day. It sets goals of addressing all deficiencies within 90 days and sending 30-day progress…
-
Company document · Union Carbide documents · November 15, 1978
R. E. Byrne, Jr. to Messrs. Myers, Norris, Walsh and Others on Calidria Warehouse Locations and Contacts, with Distributor List (1978)
A Metals Division internal memo from R. E. Byrne, Jr. listing Calidria warehouse locations and contacts in Atlanta, Finderne NJ, Hammond IN, North Kansas City and Livonia MI, and noting deletion of the Cleveland, Dallas and Houston warehouses. A…
-
Company document · Union Carbide documents · May 22, 1987
Workplace Environment Monitoring Field Data Sheet and Sketch for Aggressive Air Sampling After Asbestos Removal in Building 75 (1987)
A Workplace Environment Monitoring Field Data Sheet dated 5-22-87 for an asbestos removal project in Building 75 (Department 22050). It records three area filter-cassette samples taken during aggressive sampling after removal, each at 2 LPM for 480…
-
Company document · Union Carbide documents · January 3, 1985
L. E. Barron to Linde Division Managers Forwarding Corporate Memo and Draft Letters on EPA Asbestos Removal Notification (1985)
A January 3, 1985 cover memo from Lawrence E. Barron (Linde Division) forwarded a Corporate HS&EA memorandum and suggested notification letters from the UCC Law Department on asbestos removal. The enclosed December 13, 1984 memo from R. F. Kelley…