Company document · Union Carbide documents · June 30, 1987
Union Carbide Industrial Hygiene Asbestos Monitoring Reports for Silanes, Polymers and Monomers Areas, Prepared by C. R. McMillan and T. L. Grittie (1987)
Twelve pages of industrial hygiene monitoring and results reports dated June and July 1987, covering airborne asbestos sampling taken February to April 1987 around insulation removal, glove bag use and asbestos insulation in Silanes, Polymers and…
-
Company document · Union Carbide documents · May 4, 1987
C. R. Rotthoff to Attached Distribution List on April 22, 1987 Asbestos Standard Review Meeting (1987)
Internal memo in which C. R. Rotthoff relayed brief notes from the April 22, 1987 Asbestos Standard (1926.58) Review meeting held at Danbury. The notes cover follow-up items on non-feasibility guidance, labeling, medical examinations, contractors,…
-
Company document · Union Carbide documents · March 25, 1987
J. K. Corrie to Maintenance Staff Transmitting Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)
A March 25, 1987 cover memo from J. K. Corrie circulating a final review draft of Maintenance Safety Procedure XVIII, Asbestos Handling, for the South Charleston plant, with comments requested by April 3, 1987. The attached 20-page draft (dated…
-
Company document · Union Carbide documents · March 25, 1983
Industrial Hygiene Results: Insulation Sampling on Water Tank T-1098, Esters Area, by H. G. Kuntz and K. E. Williams (1983)
One-page industrial hygiene report dated March 25, 1983, on samples of loose and rigid insulation taken on March 23, 1983 from water tank T-1098 near the Esters tower. Chemical microscopy found no asbestos in either sample, and the report…
-
Company document · Union Carbide documents · February 11, 1987
W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement and Removal Questions, South Charleston Plant (1987)
Internal Union Carbide memo from W. J. Vincent to J. K. Corrie forwarding answers to questions raised at a recent meeting on asbestos abatement and removal. The attached "Asbestos Management" Q&A covers negative pressure enclosures…
-
Company document · Union Carbide documents · May 28, 1987
D. Liebeskind to L. W. Phair on Asbestos Orientation for Sistersville Plant Workers, with Asbestos Abatement Brochure (1987)
…would conduct an asbestos orientation for workers at the Sistersville plant for about $1000/day plus expenses. The memo asks for the Union's views and attaches a brochure, 'Asbestos Abatement: Doin' It Right – Work Practices'…
-
Company document · Union Carbide documents · September 1, 1987
T. G. Huff to J. F. Dodd and Others, Project Scope Document for Building 303 Demolition, Phase III, South Charleston Plant (1987)
Project scope document for the second-stage demolition of Building 303 at the South Charleston plant, to clear space for truck trailers serving the new Drumming Center. It describes the phased work and the removal of asbestos pipe insulation and…
-
Company document · Union Carbide documents · January 27, 1987
D. R. Crowell II to C. R. Rotthoff on Use of Negative Pressure Enclosures for Asbestos Operations, with R. D. Ondocsin's OSHA Asbestos Standard Memo (1987)
A Union Carbide Law Department memo of January 27, 1987 reports a conversation with Bob Ondocsin on whether negative pressure enclosures are required when mastic is reapplied over asbestos insulation. It says OSHA reads the asbestos…
-
Company document · Union Carbide documents · September 1, 1987
T. G. Huff to D. J. McNeil and Others: Project Scope Document for B-303 Transitional Operation/Demolition Phase II, South Charleston Plant (1987)
Project scope document for Building 303 transitional operation and demolition at the South Charleston Plant. It describes temporary drum-handling facilities and the removal and disposal of asbestos-containing transite siding by an abatement…
-
Company document · Union Carbide documents · May 27, 1987
C. R. Rotthoff to Attached Distribution List on Asbestos Negative Pressure Enclosures (1987)
Internal memo from C. R. Rotthoff of Personnel Safety, Specialty Chemicals Division, dated May 27, 1987, about asbestos negative pressure enclosures. It states that such enclosures can contain hazardous atmospheres if the enclosed system leaks or…
-
Company document · Union Carbide documents · February 24, 1987
W. J. Vincent to All Department Heads on Labelling of Asbestos Materials, with Standard Practice SH-256 on Removal and Handling of Asbestos-Containing Insulation (1987)
A February 1987 internal memo from the South Charleston Plant Safety and Health Department told department heads that asbestos warning labels were now required on installed asbestos products whenever feasible and gave the supplier and cost. Attached…
-
Company document · Union Carbide documents · November 7, 1986
D. A. Boggs to S. L. Curtis on Serious Asbestos Health Hazard in the Monomers North Rectification Area, Sistersville Plant (1986)
Memo from the Sistersville Plant industrial hygienist reporting exposed, deteriorating asbestos insulation on distillation columns in the Monomers North Rectification Area and chunks of asbestos material found on the ground up to about 60 yards…
-
Company document · Union Carbide documents · February 11, 1987
W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement Questions, South Charleston Plant (1987)
Internal Union Carbide memo from W. J. Vincent to J. K. Corrie, stamped received by the Maintenance Department on Feb. 17, 1987, forwarding answers to questions on asbestos raised at a recent meeting on asbestos abatement…
-
Company document · Union Carbide documents · August 23, 1987
T. G. Huff to S. W. Drake and Others: Project Scope Document for B-303 Demolition and Transite Siding Removal, South Charleston Plant (1987)
Project scope document for demolishing part of Building 303 at the South Charleston Plant and replacing asbestos-containing transite siding on the Chemical Mixing Unit Slurry Bay with insulated metal panels. It sets out mechanical, electrical and…
-
Company document · Union Carbide documents · March 3, 1987
C. R. Rotthoff to Distribution List on Asbestos Management Guidance for the Specialty Chemicals Division, with Attachments (1987)
A March 3, 1987 internal memo from C. R. Rotthoff gave HS&EA guidance on managing asbestos insulation in the Specialty Chemicals Division: encapsulation of serviceable insulation, replacement of damaged insulation, and regulated removal using…
-
Company document · Union Carbide documents · October 29, 1986
W. V. Summers to D. Liebeskind on the Sistersville Asbestos Insulation Upgrade Project (1986)
Memo dated October 29, 1986 from W. V. Summers at the Sistersville, WV plant to D. Liebeskind, with copies to six others, giving comments on the plant's asbestos insulation upgrade project. It describes damaged installed asbestos insulation as the…
-
Company document · Union Carbide documents · November 5, 1986
D. G. Beddow to L. W. Phair on Asbestos Insulation Investigation, with D. A. Boggs to S. L. Curtis on Serious Asbestos Health Hazard at the Sistersville Plant (1986)
Two Union Carbide Sistersville, WV memos from November 1986 about deteriorating asbestos insulation on six distillation columns in the methyls/monomers area. The Nov. 5 memo from D. G. Beddow describes the condition, lists repair options…
-
Company document · Union Carbide documents · March 3, 1987
C. R. Rotthoff to Attached Distribution List on Asbestos Management in the Specialty Chemicals Division, with Attachment A from R. E. Plevan to D. Liebeskind on Encapsulation of Asbestos (1987)
A March 3, 1987 internal memo from C. R. Rotthoff gave HS&EA guidance on managing asbestos insulation at Specialty Chemicals Division facilities: encapsulation as an option, replacement of damaged insulation, and planned removal under existing…
-
Company document · Union Carbide documents · June 20, 1987
Industrial Hygiene Monitoring Report on Asbestos Exposure Concern in the Monomers Control Room, by C. R. McMillan and T. L. Grittie (1987)
One-page industrial hygiene monitoring report dated June 20, 1987, on an area air sample taken 2/13/87 in the Monomers control room after loose insulation fell onto the roof near the ventilation intake. The sample result was
-
Company document · Union Carbide documents · January 9, 1987
C. R. Rotthoff to W. J. Vincent on South Charleston Provisions for Asbestos Material Removal and Disposal (1987)
Internal correspondence in which C. R. Rotthoff commented on W. J. Vincent's South Charleston asbestos removal document, saying it assumed no technology exists to keep asbestos below the PEL. He suggested identifying which steps are mandatory…