27 results for “Union Carbide Corporation”, page 1 of 2
-
Company document · Union Carbide documents · May 4, 1987
C. R. Rotthoff to Attached Distribution List on April 22, 1987 Asbestos Standard Review Meeting (1987)
Internal memo in which C. R. Rotthoff relayed brief notes from the April 22, 1987 Asbestos Standard (1926.58) Review meeting held at Danbury. The notes cover follow-up items on non-feasibility guidance, labeling, medical examinations, contractors,…
-
Company document · Union Carbide documents · October 20, 1986
Memo to J. K. Corrie on Asbestos Disposal at Goff Mountain and a Parkersburg Landfill, South Charleston Plant (1986)
Memo dated October 20, 1986, from the Environmental Protection department at the South Charleston Plant to J. K. Corrie, with copies to several staff. It says Goff Mountain is close to banning asbestos disposal, names a Parkersburg landfill as the…
-
Company document · Union Carbide documents · March 25, 1987
J. K. Corrie to Maintenance Staff Transmitting Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)
A March 25, 1987 cover memo from J. K. Corrie circulating a final review draft of Maintenance Safety Procedure XVIII, Asbestos Handling, for the South Charleston plant, with comments requested by April 3, 1987. The attached 20-page draft (dated…
-
Company document · Union Carbide documents · June 11, 1987
M. J. Shoger to J. K. Corrie and Others on Asbestos Enclosures and HWP Requirements Meeting (1987)
Internal Union Carbide memo announcing a June 19 meeting, sponsored by Chuck Rotthoff, with Institute, South Charleston and Sistersville personnel on plant practices for enclosures used in asbestos removal. It states there were two close calls…
-
Company document · Union Carbide documents · September 25, 1986
W. J. Vincent to J. K. Corrie and Others on the New Asbestos Construction Standard (1986)
A September 1986 memo from W. J. Vincent transmitting a summary of the new OSHA Asbestos Construction Industry Standard. The attached summary covers the 0.2 f/cc permissible exposure limit, the 0.1 f/cc action level, monitoring, respirators,…
-
Company document · Union Carbide documents · February 11, 1987
W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement and Removal Questions, South Charleston Plant (1987)
Internal Union Carbide memo from W. J. Vincent to J. K. Corrie forwarding answers to questions raised at a recent meeting on asbestos abatement and removal. The attached "Asbestos Management" Q&A covers negative pressure enclosures…
-
Company document · Union Carbide documents · July 7, 1987
J. K. Corrie to H. W. Wegert and G. M. Whipple on Environmental Concerns in the South Charleston Insulation Upgrade Project, with Revised Asbestos Handling Procedure (1987)
Internal correspondence from J. K. Corrie transmitting the revised South Charleston Plant Maintenance Safety Procedure XVIII on asbestos handling. The memo says the revision addresses concerns raised in an October 30, 1986 review of the plant's…
-
Company document · Union Carbide documents · May 28, 1987
D. Liebeskind to L. W. Phair on Asbestos Orientation for Sistersville Plant Workers, with Asbestos Abatement Brochure (1987)
…would conduct an asbestos orientation for workers at the Sistersville plant for about $1000/day plus expenses. The memo asks for the Union's views and attaches a brochure, 'Asbestos Abatement: Doin' It Right – Work Practices'…
-
Company document · Union Carbide documents · September 1, 1987
T. G. Huff to J. F. Dodd and Others, Project Scope Document for Building 303 Demolition, Phase III, South Charleston Plant (1987)
Project scope document for the second-stage demolition of Building 303 at the South Charleston plant, to clear space for truck trailers serving the new Drumming Center. It describes the phased work and the removal of asbestos pipe insulation and…
-
Company document · Union Carbide documents · April 1, 1987
Dennis H. Hanshew to J. K. Corrie on Review of Maintenance Safety Procedure XVIII, Asbestos Handling (1987)
Memo in which the Environmental Protection Department reviewed the South Charleston Plant's Asbestos Handling Procedure (Maintenance Safety Procedure XVIII) and gave two comments. It asked that "and signed" be deleted from a sentence on page 16 and…
-
Company document · Union Carbide documents · January 27, 1987
D. R. Crowell II to C. R. Rotthoff on Use of Negative Pressure Enclosures for Asbestos Operations, with R. D. Ondocsin's OSHA Asbestos Standard Memo (1987)
A Union Carbide Law Department memo of January 27, 1987 reports a conversation with Bob Ondocsin on whether negative pressure enclosures are required when mastic is reapplied over asbestos insulation. It says OSHA reads the asbestos…
-
Company document · Union Carbide documents · September 1, 1987
T. G. Huff to D. J. McNeil and Others: Project Scope Document for B-303 Transitional Operation/Demolition Phase II, South Charleston Plant (1987)
Project scope document for Building 303 transitional operation and demolition at the South Charleston Plant. It describes temporary drum-handling facilities and the removal and disposal of asbestos-containing transite siding by an abatement…
-
Company document · Union Carbide documents · May 27, 1987
C. R. Rotthoff to Attached Distribution List on Asbestos Negative Pressure Enclosures (1987)
Internal memo from C. R. Rotthoff of Personnel Safety, Specialty Chemicals Division, dated May 27, 1987, about asbestos negative pressure enclosures. It states that such enclosures can contain hazardous atmospheres if the enclosed system leaks or…
-
Company document · Union Carbide documents · February 24, 1987
W. J. Vincent to All Department Heads on Labelling of Asbestos Materials, with Standard Practice SH-256 on Removal and Handling of Asbestos-Containing Insulation (1987)
A February 1987 internal memo from the South Charleston Plant Safety and Health Department told department heads that asbestos warning labels were now required on installed asbestos products whenever feasible and gave the supplier and cost. Attached…
-
Company document · Union Carbide documents · November 7, 1986
D. A. Boggs to S. L. Curtis on Serious Asbestos Health Hazard in the Monomers North Rectification Area, Sistersville Plant (1986)
Memo from the Sistersville Plant industrial hygienist reporting exposed, deteriorating asbestos insulation on distillation columns in the Monomers North Rectification Area and chunks of asbestos material found on the ground up to about 60 yards…
-
Company document · Union Carbide documents · February 11, 1987
W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement Questions, South Charleston Plant (1987)
Internal Union Carbide memo from W. J. Vincent to J. K. Corrie, stamped received by the Maintenance Department on Feb. 17, 1987, forwarding answers to questions on asbestos raised at a recent meeting on asbestos abatement…
-
Company document · Union Carbide documents · April 28, 1986
J. K. Corrie Handwritten Asbestos Bag Use Audit Findings (1986)
One-page handwritten note headed 'Asbestos Bag Use Audit', dated 4/28/86 and signed by Corrie. It says M.E. Knopp and J.K. Corrie audited on 4/25/86 after a report that asbestos insulation bags were being used improperly. It lists three findings at…
-
Company document · Union Carbide documents · August 23, 1987
T. G. Huff to S. W. Drake and Others: Project Scope Document for B-303 Demolition and Transite Siding Removal, South Charleston Plant (1987)
Project scope document for demolishing part of Building 303 at the South Charleston Plant and replacing asbestos-containing transite siding on the Chemical Mixing Unit Slurry Bay with insulated metal panels. It sets out mechanical, electrical and…
-
Company document · Union Carbide documents · March 3, 1987
C. R. Rotthoff to Distribution List on Asbestos Management Guidance for the Specialty Chemicals Division, with Attachments (1987)
A March 3, 1987 internal memo from C. R. Rotthoff gave HS&EA guidance on managing asbestos insulation in the Specialty Chemicals Division: encapsulation of serviceable insulation, replacement of damaged insulation, and regulated removal using…
-
Company document · Union Carbide documents · July 7, 1987
J. K. Corrie to H. W. Wegert and G. M. Whipple on Environmental Concerns from the Insulation Upgrade Project Review, South Charleston, with Asbestos Handling Procedure XVIII (1987)
A July 7, 1987 internal memo from J. K. Corrie transmitted the revised South Charleston Plant Maintenance Safety Procedure XVIII on asbestos handling and a May 6, 1987 letter from Dennis Hanshew. Corrie asked the reviewers to confirm their…