Company document · Union Carbide documents · September 24, 1984
D. H. Ott to D. F. Finley and F. L. McCarty on Winterization Planning and Maintenance Work (1984)
Memo from D. H. Ott following up on discussions about winterization planning at the Phase IV area and Bldg. 103. It sets a priority order for equipment work, flags insulation work and manpower as critical, and asks for weekly progress updates, cost…
-
Company document · Union Carbide documents · April 29, 1986
D. R. Stokely to Dr. D. L. Liebeskind Transmitting Action Plan for the South Charleston Chemical Mixing Dept. Safety/Health Survey (1986)
Internal Union Carbide memo from the South Charleston Plant transmitting an action plan that responds to concerns raised in the July 15-19, 1985 operational safety/health survey of the Chemical Mixing Department (514). It lists…
-
Company document · Union Carbide documents · May 21, 1987
South Charleston Plant Accident/Incident Report and Review Board Analysis on Vapor Release Under Plastic Enclosure at Tanks 643-644 During Asbestos Insulation Removal (1987)
Accident/incident report and informal Review Board analysis of a May 21, 1987 near-miss in the Polyols department at South Charleston. Reactor contents transferred to tank 643 vented into a plastic enclosure installed for asbestos insulation…
-
Company document · Union Carbide documents · September 1, 1987
T. G. Huff to J. F. Dodd and Others, Project Scope Document for Building 303 Demolition, Phase III, South Charleston Plant (1987)
Project scope document for the second-stage demolition of Building 303 at the South Charleston plant, to clear space for truck trailers serving the new Drumming Center. It describes the phased work and the removal of asbestos pipe insulation and…
-
Company document · Union Carbide documents · September 1, 1987
T. G. Huff to D. J. McNeil and Others: Project Scope Document for B-303 Transitional Operation/Demolition Phase II, South Charleston Plant (1987)
Project scope document for Building 303 transitional operation and demolition at the South Charleston Plant. It describes temporary drum-handling facilities and the removal and disposal of asbestos-containing transite siding by an abatement…
-
Company document · Union Carbide documents · March 4, 1986
D. H. Ott to J. R. Dement and S. Rossi on Tank Insulation in 1986, with Tank Insulation Needs Table (1986)
A March 4, 1986 memo from D. H. Ott to J. R. Dement and S. Rossi about the 1986 budget for tank insulation and weatherproofing work in Polyols, noting two tanks were started in 1985 because of the need to remove damaged asbestos insulation. The…
-
Company document · Union Carbide documents · August 10, 1984
D. B. Howard to R. H. Stodghill and D. R. Stokely on Winter Preparations for Silicones II (1984)
Area 5 Maintenance internal correspondence asking the Silicones II staff to list equipment repairs, insulation work and facility repairs needed to prepare for winter. The memo said maintenance would then prepare a Ghant chart of expected completion…
-
Company document · Union Carbide documents · July 22, 1987
S. B. Kovach to D. R. Stokely Transmitting SHARE Inspection Results, South Charleston Plant (1987)
Cover letter from the South Charleston Plant SHARE Coordinator sending D. R. Stokely the findings of a SHARE inspection held July 22, 1987, and setting program goals for correcting deficiencies. It has a 30/60/90-day progress update block and…
-
Company document · Union Carbide documents · August 12, 1987
S. B. Kovach to D. H. Ott Transmitting SHARE Inspection Results, with Audit Team's Report for Polyols Insulation (1987)
Cover letter from the South Charleston Plant SHARE Coordinator to D. H. Ott forwarding findings from the SHARE inspection of August 12, 1987. It sets goals of addressing deficiencies within 90 days and sending 30-day progress updates, and includes a…
-
Company document · Union Carbide documents · August 23, 1987
T. G. Huff to S. W. Drake and Others: Project Scope Document for B-303 Demolition and Transite Siding Removal, South Charleston Plant (1987)
Project scope document for demolishing part of Building 303 at the South Charleston Plant and replacing asbestos-containing transite siding on the Chemical Mixing Unit Slurry Bay with insulated metal panels. It sets out mechanical, electrical and…
-
Company document · Union Carbide documents · March 6, 1987
D. R. Stokely to R. G. Link Transmitting Action Plan Update on 514 Chemical Mixing Department Safety/Health Survey, with Asbestos Insulation Items (1987)
A one-page transmittal memo from D. R. Stokely to R. G. Link, copied to ten others, attaches an update on the action plan responding to the July 1985 operational safety/health survey of Plant 514 (Chemical Mixing Department). The two attached pages…
-
Company document · Union Carbide documents · June 17, 1987
S. B. Kovach to D. H. Ott Transmitting South Charleston Plant SHARE Inspection Results, with Audit Team Reports Noting Exposed Asbestos Insulation (1987)
A June 17, 1987 cover letter from the SHARE Coordinator at the South Charleston Plant to D. H. Ott forwarding findings of a SHARE inspection, stating that deficiencies must be addressed within 90 days and progress updates sent every 30 days. The…
-
Company document · Union Carbide documents · October 26, 1987
S. B. Kovach to P. R. Desai and Others Transmitting SHARE Inspection Results, South Charleston Plant (1987)
Cover letter dated October 26, 1987 from the SHARE Coordinator at the South Charleston, West Virginia plant, sending department heads the findings of the October 14, 1987 SHARE inspection and setting a 90-day deadline to address deficiencies with…