7 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · September 12, 1980
G. F. Hurley to B. E. Bess and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)
Letter reporting asbestos air monitoring in the SEVIN operations area on September 3, 1980, which showed 0.1 fiber per cc. Six breathing-zone samples were taken on three men, but an analytical error left only one valid sample, for Mr. Smith. The…
-
Company document · Union Carbide documents · September 12, 1980
G. F. Hurley to B. E. Bess, P. W. Young and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)
Letter reporting that asbestos monitoring in the SEVIN operations area on September 3, 1980 showed 0.1 fiber per cc, which it described as below the present OSHA standard. Six breathing-zone samples were taken on three men, but because of an…
-
Company document · Union Carbide documents · March 29, 1979
W. F. Blythe, Jr. to D. L. Johnson, E. C. Shipley and E. J. Tawney on Asbestos Monitoring of Insulators at Institute (1979)
Internal memo reporting air sampling of construction insulators removing asbestos-containing insulation from a 3-inch steam line at the Institute, West Virginia, plant on March 17 and 19, 1979. It reported fiber concentrations of 0.7 to 3.4…
-
Company document · Union Carbide documents · March 29, 1979
W. F. Blythe, Jr. to D. L. Johnson, E. C. Shipley and E. J. Tawney on Asbestos Monitoring of Insulators at Institute, West Virginia (1979)
Internal industrial hygiene report on personal and area air sampling for asbestos during removal of insulation from a 3-inch steam line at the Institute, West Virginia plant on March 17 and 19, 1979. Results ranged from 0.2 to 3.4 fibers/cc for…
-
Company document · Union Carbide documents · August 1980
Ruth Clise to R. F. Painter: Industrial Hygiene Monitoring Reports for Asbestos During Insulation Stripping in Bldg. 777 (1980)
Five 'Industrial Hygiene Monitoring for Asbestos' report forms addressed to R. F. Painter with copies to several others. They give personal air-sampling results for workers wetting, bagging and stripping insulation at Bldg. 777 on 8/18/80, 8/19/80…
-
Company document · Union Carbide documents · March 3, 1980
Technical Center Industrial Hygiene Report on Asbestos Monitoring During Boiler Insulation Removal at Institute #2 Powerhouse (1980)
Internal correspondence reporting personal air sampling of employees during removal of insulation from a boiler at the #2 Powerhouse at Institute, West Virginia, on February 20, 1980. Sample concentrations ranged from 0.2 to 0.8 f/cc, which the memo…
-
Company document · Union Carbide documents · March 29, 1979
W. F. Blythe, Jr. to D. L. Johnson, E. C. Shipley and E. J. Tawney on Asbestos Monitoring During Insulation Removal at Institute (1979)
Internal industrial hygiene report on air sampling of construction insulators removing asbestos insulation from a 3-inch steam line at the Institute, West Virginia plant on March 17 and 19, 1979. Personal samples ranged from 0.7 to 3.4 fibers/cc on…