No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

16 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · May 21, 1979

    P. R. Schweppe to Piping Group on Discontinuing Asbestos Rope as Centering Device for Clay and Cast Iron Soil Pipe, with Attached Standards Program Memo (1979)

    Cover memorandum from P. R. Schweppe transmitting a May 10, 1979 Standards Program memo about asbestos rope used as centering devices for cast iron soil pipe and clay pipe sewer and drain systems. The attached memo said handling asbestos rope may…

  2. Company document · Union Carbide documents · September 2, 1987

    L. S. Magelssen and H. W. Wegert to J. F. Dodd et al. on Status of Contingency Items for Asbestos Insulation Removal Upgrade, South Charleston (1987)

    Two-page memorandum reporting that two contingency items attached to the May 19, 1987 health, safety and environmental endorsement of the South Charleston Asbestos Insulation Removal Upgrade-Phase I had been resolved. It discusses review of the…

  3. Company document · Union Carbide documents · October 30, 1986

    H. W. Wegert and G. M. Whipple to J. R. Dement and Others on Health, Safety and Environmental Review of the South Charleston Insulation Upgrade Project (1986)

    Memorandum reporting a health, safety and environmental review of a three-year project to remove, replace and seal asbestos insulation at the South Charleston Plant. It recommends endorsement contingent on revising Maintenance Procedure XVIII to…

  4. Company document · Union Carbide documents · October 30, 1986

    H. W. Wegert and G. M. Whipple to J. R. Dement et al. on Health, Safety, and Environmental Review of the South Charleston Insulation Upgrade Project (1986)

    Memorandum reporting a health, safety and environmental review of a three-year project to upgrade asbestos insulation at the South Charleston Plant. It recommended endorsement contingent on revising Maintenance Procedure XVIII to comply with the…

  5. Company document · Union Carbide documents · February 26, 1986

    T. L. Grittie to R. E. Crum and Others on Results of Asbestos Analysis of Lint from Vogue-Swift Washing Machines (1986)

    …results of the lint analysis (Feb. 26, 1986), with handwritten note Kemron Environmental Services fiber identification qualitative analysis form for Union Carbide, sample 5610696 (scanned upside down) Borg-Warner inter-office correspondence dated Feb. 12, 1986…

  6. Company document · Union Carbide documents · December 10, 1986

    Methyls Columns Upgrade Work Package for Removal of Deteriorated Asbestos Insulation at the Sistersville, WV Plant, with Plant Asbestos Handling Procedure (1986)

    Work order package (Job 930-38037A) released 12-10-86 for stripping badly deteriorated asbestos insulation from six Methyls columns at the Sistersville plant and re-insulating some with calcium silicate. It includes a work description, insulation…

  7. Company document · Union Carbide documents · May 19, 1987

    L. S. Magelssen and H. W. Wegert to J. R. Dement and Others on Health, Safety and Environmental Review of the South Charleston Asbestos Insulation Removal Upgrade, Phase I (1987)

    A May 19, 1987 memo recommending endorsement of Phase I of a project to remove and upgrade asbestos insulation at the South Charleston plant. The endorsement is contingent on revising Maintenance Procedure XVIII to comply with OSHA 29 CFR 1926.58…

  8. Company document · Union Carbide documents · May 31, 1984

    D. A. Gosselin to John Buzzard on Laundering Asbestos-Contaminated Clothing under the OSHA Standard (1984)

    Internal Union Carbide memo in which D. A. Gosselin responded to John Buzzard's letter about laundering asbestos-contaminated clothing under OSHA Standard 1910.1001. He recommended that a letter be sent to the owner of…

  9. Company document · Union Carbide documents · September 2, 1987

    L. S. Magelssen and H. W. Wegert to J. F. Dodd and Others on Status of Contingency Items for Asbestos Insulation Removal Upgrade, South Charleston (1987)

    Memorandum reporting that two contingency items attached to the May 19, 1987 endorsement of the South Charleston asbestos insulation removal upgrade (Phase I) had been resolved. It says the February 1987 asbestos maintenance procedures were reviewed…

  10. Company document · Union Carbide documents · March 18, 1986

    T. L. Grittie to D. A. Boggs and Others on McCrone Analysis of Jaxsan Insulation Samples at Sistersville (1986)

    Memo from T. L. Grittie transmitting McCrone Environmental Services' analysis of five Jaxsan insulation samples from the Sistersville plant. The memo reports 7-15% chrysotile asbestos, higher than the supplier had stated, and says the material…

  11. Company document · Union Carbide documents · March 18, 1986

    T. L. Grittie to D. A. Boggs and Others on McCrone Analysis of Jaxsan Insulation Samples for Asbestos (1986)

    Memo from the Sistersville plant industrial hygienist transmitting McCrone Environmental Services' analysis of five Jaxsan samples. It reports 7-15% chrysotile, higher than the supplier indicated, says the IH group will monitor insulators during…

  12. Company document · Union Carbide documents · May 19, 1987

    L. S. Magelssen and H. W. Wegert to J. R. Dement and Others on Health, Safety and Environmental Review of the Asbestos Insulation Removal Upgrade, South Charleston (1987)

    Memo recommending endorsement of Phase I of the asbestos insulation removal and upgrade project at the South Charleston plant. It notes that OSHA's 29 CFR 1926.58 rule, promulgated January 16, 1987, raised the cost of removal and repair. Endorsement…

  13. Company document · Union Carbide documents · May 31, 1984

    D. A. Gosselin to John Buzzard on Laundering Asbestos-Contaminated Clothing (1984)

    Internal correspondence in which D. A. Gosselin responded to John Buzzard's letter about laundering asbestos-contaminated clothing under OSHA Standard 1910.1001. He advised that a letter be sent to the owner of Vogue-Swift Cleaners citing the…

  14. Company document · Union Carbide documents · March 20, 1987

    C. A. Eddy to E. C. Buford and Others on March 19, 1987 Meeting Minutes, Methyls Columns Asbestos Insulation Removal at Sistersville (1987)

    Minutes, dated March 20, 1987, of a March 19, 1987 meeting at the Sistersville Plant to plan removal of asbestos insulation from six methyls columns. They list 19 items on the handling of each column, use of a negative pressure enclosure, area…

  15. Company document · Union Carbide documents · November 12, 1986

    J. L. Worstell to R. L. Foster and C. H. Hancock Forwarding EPA Notice of Deficiency on Asbestos Renovation at South Charleston Plant (1986)

    …EPA Region III Notice of Deficiency dated November 7, 1986, and Union Carbide's asbestos removal notification for the No. 19 Batch Still at the Mainland Chemicals Unit. The EPA letter stated the notice was incomplete…

  16. Company document · Union Carbide documents · May 21, 1979

    P. R. Schweppe to Engineering Distribution on Discontinuing Asbestos Centering Rope for Clay Pipe and Cast Iron Soil Pipe, with Attached L. A. Peggs Memo (1979)

    A May 21, 1979 cover memorandum from P. R. Schweppe forwarding an attached May 10, 1979 memo from the Chemicals/Plastics Division Standards Program (questions directed to L. A. Peggs). The attached memo states that asbestos rope listed in piping…