6 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · February 11, 1985

    W. L. Thomas to W. E. Ballard and Others Calling a Meeting on the Asbestos Insulation Replacement Project, with J. G. Roy's No. 2 Steam Plant Proposal (1985)

    A February 11, 1985 memorandum from W. L. Thomas called a February 21, 1985 meeting to plan an asbestos insulation replacement project at the South Charleston plant and attached a December 27, 1984 proposal by J. G. Roy. Roy's proposal outlined a…

  2. Company document · Union Carbide documents · December 14, 1983

    R. A. Ream to L. D. Diggs and Others on Energy Systems Department Asbestos Handling Procedures (1983)

    Memo from R. A. Ream to five named recipients, with copies to about a dozen others, shift superintendents and ES routing lists, setting two requirements for the Energy Systems (ES) Department at the South Charleston Plant. Removal of insulation…

  3. Company document · Union Carbide documents · September 25, 1986

    W. J. Vincent to J. K. Corrie and Others on the New Asbestos Construction Standard (1986)

    A September 1986 memo from W. J. Vincent transmitting a summary of the new OSHA Asbestos Construction Industry Standard. The attached summary covers the 0.2 f/cc permissible exposure limit, the 0.1 f/cc action level, monitoring, respirators,…

  4. Company document · Union Carbide documents · February 25, 1985

    I. L. Beckett to W. E. Ballard et al. on Minutes of the Asbestos Insulation Replacement Project, Phase I Meeting, South Charleston Plant (1985)

    Memorandum giving minutes of a February 21, 1985 meeting on a project to repair and replace asbestos insulation at the South Charleston Plant. It records the 1985 funding limit, the choice of six departments to start with, the plan to use…

  5. Company document · Union Carbide documents · April 17, 1985

    I. L. Beckett to J. F. Dodd and Others on Project Scope for Safety/Health Insulation, No. 2 Powerhouse, Building 151 (1985)

    Memorandum setting out a project scope for removing, replacing or sealing deteriorated asbestos insulation in the No. 2 Powerhouse (Building 151) at South Charleston, West Virginia. It describes the capital and removal work, safety and environmental…

  6. Company document · Union Carbide documents · May 30, 1986

    W. J. Vincent to Calvin Thompson, Industrial Hygiene Survey Report on Asbestos at Logan Pump Station, South Charleston Plant (1986)

    One-page industrial hygiene survey report form for the South Charleston Plant, dated May 30, 1986. It records an area/source asbestos survey at the Logan Pump Station on April 11, 1986, with a 135-minute sample and a result of .005 F/cc, marked IC…