7 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · June 28, 1985
W. C. Young to Plant Managers Department on Asbestos Exposure Effects and Potential of Non-Insulator Crafts, with Plant 514 Asbestos Dust Measurement Printouts (1985)
Internal memo of June 28, 1985 from the South Charleston Plant to the Managers Department stating that plant asbestos dust measurements were below OSHA limits, but the writer questioned whether any level of inhalation exposure is safe without…
-
Company document · Union Carbide documents · September 1, 1987
T. G. Huff to J. F. Dodd and Others, Project Scope Document for Building 303 Demolition, Phase III, South Charleston Plant (1987)
Project scope document for the second-stage demolition of Building 303 at the South Charleston plant, to clear space for truck trailers serving the new Drumming Center. It describes the phased work and the removal of asbestos pipe insulation and…
-
Company document · Union Carbide documents · September 1, 1987
T. G. Huff to D. J. McNeil and Others: Project Scope Document for B-303 Transitional Operation/Demolition Phase II, South Charleston Plant (1987)
Project scope document for Building 303 transitional operation and demolition at the South Charleston Plant. It describes temporary drum-handling facilities and the removal and disposal of asbestos-containing transite siding by an abatement…
-
Company document · Union Carbide documents · May 30, 1984
F. A. Sanchez to R. E. Peele and W. S. Walker on NESHAP Asbestos Standards Applicable at the 514 Plant (1984)
Internal correspondence from the Environmental Protection department sending a summary of the NESHAP asbestos standards (40 CFR Part 61, Subpart M) that apply to operations at Location 514, and asking recipients to pass it to the people responsible…
-
Company document · Union Carbide documents · August 23, 1987
T. G. Huff to S. W. Drake and Others: Project Scope Document for B-303 Demolition and Transite Siding Removal, South Charleston Plant (1987)
Project scope document for demolishing part of Building 303 at the South Charleston Plant and replacing asbestos-containing transite siding on the Chemical Mixing Unit Slurry Bay with insulated metal panels. It sets out mechanical, electrical and…
-
Company document · Union Carbide documents · January 9, 1985
J. R. Soice to W. S. Walker on EPA Asbestos Regulations at the South Charleston Plant (1985)
Internal Union Carbide correspondence from the South Charleston Plant summarizing EPA requirements for asbestos demolition, renovation, removal and disposal at Plant 514. It describes advance notification to the EPA, wet removal into labelled leak-tight containers…
-
Company document · Union Carbide documents · May 22, 1985
A. E. Wood to All Department Heads on Use of Non-Asbestos Gaskets at South Charleston (1985)
Memorandum from A. E. Wood reporting that the GR shop had used non-asbestos gaskets on pump heads since 1983 to decrease asbestos exposure, and that inspected non-asbestos gaskets showed binder attack by process chemicals. It sets out an action plan…