40 results for “Union Carbide Corporation”, page 1 of 2
-
Company document · Union Carbide documents · 1987
Union Carbide Asbestos Removal and Phase-Out Papers, Including T. E. Hanning Memo on Contractor Project Development Group (1987)
…Chemicals and Plastics Business Group, use of asbestos-containing materials in the work place Grafoil seminar outline and cover sheet (Union Carbide Specialty Products Group, Cleveland) Grafoil flexible graphite newsletter on special gasketing techniques Distribution list…
-
Company document · Union Carbide documents · May 1987
Union Carbide Memos and Draft C&P Program on Phasing Out Asbestos-Containing Materials in Company Workplaces (1986-1987)
Six pages of Union Carbide papers from 1986-1987 on asbestos in the company's own facilities. They include a 9/29/86 draft Chemicals and Plastics (C&P) program to phase out asbestos-containing materials…
-
Company document · Union Carbide documents · June 30, 1987
Union Carbide Industrial Hygiene Asbestos Monitoring Reports for Silanes, Polymers and Monomers Areas, Prepared by C. R. McMillan and T. L. Grittie (1987)
Twelve pages of industrial hygiene monitoring and results reports dated June and July 1987, covering airborne asbestos sampling taken February to April 1987 around insulation removal, glove bag use and asbestos insulation in Silanes, Polymers and…
-
Company document · Union Carbide documents · September 5, 1986
T. E. Hanning to S. W. Clark and Others on Asbestos Update: Union Support for Proposed EPA Ban (1986)
…marked 'For Your Information', reporting that labor unions were endorsing a proposed EPA asbestos ban and contending that OSHA's 0.2 fiber/cc limit gave insufficient worker protection. It also summarizes the proposed EPA rule…
-
Company document · Union Carbide documents · March 21, 1984
G. D. Twait to Wayne Williams on November 1983 Revisions to SH-256, Removal and Handling of Asbestos-Containing Insulation Material (1984)
A handwritten 1984 note from G. D. Twait to Wayne Williams confirming that the asbestos permissible exposure limit in the November 1983 revision of SH-256 would stay at 0.5 fibers/cc, with attached material. The attachments are the OSHA emergency…
-
Company document · Union Carbide documents · April 7, 1987
T. L. Grittie, Industrial Hygiene Results on Asbestos Monitoring During Deinsulation of R-2 Reactor, Silanes (1987)
Industrial hygiene results dated April 7, 1987 for breathing-zone asbestos samples taken February 10, 1987 on insulators removing insulation from reactor R-2 in the Reactor Area of Silanes inside a negative pressure enclosure. The two samples…
-
Company document · Union Carbide documents · May 5, 1987
R. S. Newberger and J. K. Kyle Memos on Asbestos Disposal and Ceiling Contamination at the Sistersville, WV Plant (1987)
Two Union Carbide memoranda from the Sistersville, West Virginia plant. The first (May 5, 1987) reports that asbestos insulation was being stripped in the Silanes Department and that the burial location was full. The second (April…
-
Company document · Union Carbide documents · September 2, 1987
L. S. Magelssen and H. W. Wegert to J. F. Dodd et al. on Status of Contingency Items for Asbestos Insulation Removal Upgrade, South Charleston (1987)
Two-page memorandum reporting that two contingency items attached to the May 19, 1987 health, safety and environmental endorsement of the South Charleston Asbestos Insulation Removal Upgrade-Phase I had been resolved. It discusses review of the…
-
Company document · Union Carbide documents · July 20, 1984
W. V. Summers, Jr. to A. W. Boyd and Wayne Watkins Transmitting G. W. Wulfert's Guidelines on Asbestos Insulation Repairs and Removal at Sistersville (1984)
A cover memo from W. V. Summers, Jr. dated July 20, 1984 forwards a July 18, 1984 memo from George W. Wulfert on the Sistersville Plant's guidelines for maintaining and removing asbestos insulation. The attached memo states the plant would not…
-
Company document · Union Carbide documents · November 29, 1984
C. A. Gorrell to Maintenance First Line Supervisors on Mandatory Asbestos Hazard Training, with Sistersville Plant Asbestos Script, Slides and MSA Respirator Statement (1984)
A November 29, 1984 memo from C. A. Gorrell told maintenance first-line supervisors that an asbestos hazards program was mandatory and had to be presented to their work groups before January 1, 1985. The exhibit also holds typed and handwritten…
-
Company document · Union Carbide documents · June 28, 1985
W. C. Young to Plant Managers Department on Asbestos Exposure Effects and Potential of Non-Insulator Crafts, with Plant 514 Asbestos Dust Measurement Printouts (1985)
Internal memo of June 28, 1985 from the South Charleston Plant to the Managers Department stating that plant asbestos dust measurements were below OSHA limits, but the writer questioned whether any level of inhalation exposure is safe without…
-
Company document · Union Carbide documents · October 28, 1986
T. E. Hanning to Recipient on Review of South Charleston Plant Procedures for Removal and Disposal of Asbestos Materials (1986)
Memorandum from T. E. Hanning reviewing updates to the South Charleston plant's 514 Maintenance Department procedure for handling and disposing of asbestos insulation, following the July 1986 OSHA revision. It sets out the revised exposure limit and…
-
Company document · Union Carbide documents · May 4, 1987
A. L. Barefoot to Location Managers on Employee Pulmonary Problems (1987)
A memo marked Business Confidential reporting that Dr. H. C. Lewinsohn of Corporate Medical said at an OSHA/Asbestos meeting in Danbury that employees with asbestosis or other severe pulmonary problems should not work with asbestos materials.…
-
Company document · Union Carbide documents · October 30, 1986
H. W. Wegert and G. M. Whipple to J. R. Dement and Others on Health, Safety and Environmental Review of the South Charleston Insulation Upgrade Project (1986)
Memorandum reporting a health, safety and environmental review of a three-year project to remove, replace and seal asbestos insulation at the South Charleston Plant. It recommends endorsement contingent on revising Maintenance Procedure XVIII to…
-
Company document · Union Carbide documents · October 30, 1986
H. W. Wegert and G. M. Whipple to J. R. Dement et al. on Health, Safety, and Environmental Review of the South Charleston Insulation Upgrade Project (1986)
Memorandum reporting a health, safety and environmental review of a three-year project to upgrade asbestos insulation at the South Charleston Plant. It recommended endorsement contingent on revising Maintenance Procedure XVIII to comply with the…
-
Company document · Union Carbide documents · February 1, 1984
C. A. McNeill to J. B. Mickey Transmitting Draft Safety and Health Requirements for Contractors, Sistersville Plant (1984)
A February 1, 1984 cover memo from C. A. McNeill to J. B. Mickey attaching a draft package of three documents on safety and health requirements for contractors at the Sistersville Plant. The package includes contractor rules, a list of potential…
-
Company document · Union Carbide documents · November 7, 1986
D. A. Boggs to S. L. Curtis on Serious Asbestos Health Hazard in the Monomers North Rectification Area, Sistersville Plant (1986)
Memo from the Sistersville Plant industrial hygienist reporting exposed, deteriorating asbestos insulation on distillation columns in the Monomers North Rectification Area and chunks of asbestos material found on the ground up to about 60 yards…
-
Company document · Union Carbide documents · June 30, 1987
Industrial Hygiene Results: Asbestos Exposure of UCC Design and Construction Insulators Using a Glove Bag, Polymers I Tank Farm (1987)
Industrial hygiene report dated June 30, 1987, on personal air samples taken February 13, 1987 from two UCC Design and Construction insulators removing asbestos with a glove bag at the Polymers I tank farm. One sample (0.22 f/cc) exceeded the 0.2…
-
Company document · Union Carbide documents · October 29, 1986
W. V. Summers to D. Liebeskind on the Sistersville Asbestos Insulation Upgrade Project (1986)
Memo dated October 29, 1986 from W. V. Summers at the Sistersville, WV plant to D. Liebeskind, with copies to six others, giving comments on the plant's asbestos insulation upgrade project. It describes damaged installed asbestos insulation as the…
-
Company document · Union Carbide documents · November 7, 1986
J. F. Dodd to D. A. Gosselin and Others Transmitting the South Charleston Plant Insulation Asbestos Upgrade Outline of Project (1986)
Cover memo dated November 7, 1986 transmitting for review an Outline of Project for a plantwide asbestos insulation upgrade at the South Charleston, WV plant, described as a high-priority Safety/Health Program. The attached outline describes the…