39 results for “Union Carbide Corporation”, page 1 of 2
-
Company document · Union Carbide documents · March 25, 1987
J. K. Corrie to Maintenance Staff Transmitting Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)
A March 25, 1987 cover memo from J. K. Corrie circulating a final review draft of Maintenance Safety Procedure XVIII, Asbestos Handling, for the South Charleston plant, with comments requested by April 3, 1987. The attached 20-page draft (dated…
-
Company document · Union Carbide documents · August 26, 1983
Thomas A. Lincoln to H. C. Lewinsohn on Proposal to Classify Chest Radiographs of UCC Headquarters Personnel (1983)
Internal Union Carbide memo of August 26, 1983 from the Corporate Medical Director to Dr. H. C. Lewinsohn, responding to a proposal to classify chest radiographs of corporate headquarters personnel under the ILO pneumoconiosis classification (revised…
-
Company document · Union Carbide documents · February 15, 1983
R. W. Rebholz to W. C. Thurber on Substituting a Revised Asbestos Label for the OSHA Label (1983)
Internal Union Carbide memo from R. W. Rebholz to W. C. Thurber proposing that a different attached label replace the OSHA-mandated asbestos label on UCC asbestos products shipped to U.S. users, subject to OSHA…
-
Company document · Union Carbide documents · January 27, 1987
D. R. Crowell II to C. R. Rotthoff on Use of Negative Pressure Enclosures for Asbestos Operations, with Attached Asbestos Abatement Slides (1987)
A two-page Law Department memo discussing whether negative pressure enclosures are required under the OSHA asbestos standard when mastic is reapplied over asbestos insulation on process vessels and pipelines, and when wetting techniques reduce…
-
Company document · Union Carbide documents · June 11, 1987
M. J. Shoger to J. K. Corrie and Others on Asbestos Enclosures and HWP Requirements Meeting (1987)
Internal Union Carbide memo announcing a June 19 meeting, sponsored by Chuck Rotthoff, with Institute, South Charleston and Sistersville personnel on plant practices for enclosures used in asbestos removal. It states there were two close calls…
-
Company document · Union Carbide documents · March 17, 1983
J. S. Cornell to C. E. Fry, Dr. R. W. Holland and Others on a Meeting About Asbestos-Related Medical Issues (1983)
Internal correspondence from J. S. Cornell (Safety & Health) calling a March 29 meeting at South Charleston to discuss asbestos-related medical issues. The memo proposed reviewing South Charleston's diagnostic practices, their applicability to…
-
Company document · Union Carbide documents · February 11, 1987
W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement and Removal Questions, South Charleston Plant (1987)
Internal Union Carbide memo from W. J. Vincent to J. K. Corrie forwarding answers to questions raised at a recent meeting on asbestos abatement and removal. The attached "Asbestos Management" Q&A covers negative pressure enclosures…
-
Company document · Union Carbide documents · May 4, 1987
A. L. Barefoot to Location Managers on Employee Pulmonary Problems (1987)
A memo marked Business Confidential reporting that Dr. H. C. Lewinsohn of Corporate Medical said at an OSHA/Asbestos meeting in Danbury that employees with asbestosis or other severe pulmonary problems should not work with asbestos materials.…
-
Company document · Union Carbide documents · May 28, 1987
D. Liebeskind to L. W. Phair on Asbestos Orientation for Sistersville Plant Workers, with Asbestos Abatement Brochure (1987)
…would conduct an asbestos orientation for workers at the Sistersville plant for about $1000/day plus expenses. The memo asks for the Union's views and attaches a brochure, 'Asbestos Abatement: Doin' It Right – Work Practices'…
-
Company document · Union Carbide documents · September 1, 1987
T. G. Huff to J. F. Dodd and Others, Project Scope Document for Building 303 Demolition, Phase III, South Charleston Plant (1987)
Project scope document for the second-stage demolition of Building 303 at the South Charleston plant, to clear space for truck trailers serving the new Drumming Center. It describes the phased work and the removal of asbestos pipe insulation and…
-
Company document · Union Carbide documents · March 30, 1983
J. S. Cornell to B. H. Avashia and Others on Asbestos-Related Medical Issues and OSHA 200 Log Recording (1983)
Internal memo from the Safety & Health department summarizing a March 29, 1983 South Charleston meeting on asbestos-related medical issues. It covers chest X-ray review, recording of asbestos-related abnormalities on the OSHA 200 Log, and follow-up…
-
Company document · Union Carbide documents · January 27, 1987
D. R. Crowell II to C. R. Rotthoff on Use of Negative Pressure Enclosures for Asbestos Operations, with R. D. Ondocsin's OSHA Asbestos Standard Memo (1987)
A Union Carbide Law Department memo of January 27, 1987 reports a conversation with Bob Ondocsin on whether negative pressure enclosures are required when mastic is reapplied over asbestos insulation. It says OSHA reads the asbestos…
-
Company document · Union Carbide documents · September 1, 1987
T. G. Huff to D. J. McNeil and Others: Project Scope Document for B-303 Transitional Operation/Demolition Phase II, South Charleston Plant (1987)
Project scope document for Building 303 transitional operation and demolition at the South Charleston Plant. It describes temporary drum-handling facilities and the removal and disposal of asbestos-containing transite siding by an abatement…
-
Company document · Union Carbide documents · May 18, 1983
W. F. Gorham to A. A. Lang and H. Lewinsohn on duPont's Asbestosis Film and Guidelines for Asbestos-Related Medical Cases, with Attached duPont Guideline Excerpts (1983)
A May 18, 1983 Union Carbide internal memo from W. F. Gorham reports that SCD representatives visited duPont's Medical Department to view its 30-minute film on asbestosis and received duPont's guidelines for diagnosing…
-
Company document · Union Carbide documents · February 24, 1987
W. J. Vincent to All Department Heads on Labelling of Asbestos Materials, with Standard Practice SH-256 on Removal and Handling of Asbestos-Containing Insulation (1987)
A February 1987 internal memo from the South Charleston Plant Safety and Health Department told department heads that asbestos warning labels were now required on installed asbestos products whenever feasible and gave the supplier and cost. Attached…
-
Company document · Union Carbide documents · November 7, 1986
D. A. Boggs to S. L. Curtis on Serious Asbestos Health Hazard in the Monomers North Rectification Area, Sistersville Plant (1986)
Memo from the Sistersville Plant industrial hygienist reporting exposed, deteriorating asbestos insulation on distillation columns in the Monomers North Rectification Area and chunks of asbestos material found on the ground up to about 60 yards…
-
Company document · Union Carbide documents · February 11, 1987
W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement Questions, South Charleston Plant (1987)
Internal Union Carbide memo from W. J. Vincent to J. K. Corrie, stamped received by the Maintenance Department on Feb. 17, 1987, forwarding answers to questions on asbestos raised at a recent meeting on asbestos abatement…
-
Company document · Union Carbide documents · March 17, 1983
J. S. Cornell to C. E. Fry and Others on Asbestos-Related Medical Issues, Meeting Notice (1983)
Internal memo, signed by J. S. Cornell, calling a March 29 meeting at South Charleston, West Virginia, of the Silicones & Urethane Intermediates addressees. The meeting was to discuss procedures for diagnosing and reporting asbestos-related…
-
Company document · Union Carbide documents · August 23, 1987
T. G. Huff to S. W. Drake and Others: Project Scope Document for B-303 Demolition and Transite Siding Removal, South Charleston Plant (1987)
Project scope document for demolishing part of Building 303 at the South Charleston Plant and replacing asbestos-containing transite siding on the Chemical Mixing Unit Slurry Bay with insulated metal panels. It sets out mechanical, electrical and…
-
Company document · Union Carbide documents · March 25, 1987
J. K. Corrie to J. R. Dement and Others Circulating Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)
…with handwritten routing note dated 3-25-87 and comments signed Bob Hull (UCC 019705) Clean copy of the same Corrie transmittal memo on Union Carbide Specialty Chemicals Division letterhead (UCC 019706) Maintenance Safety Manual XVIII…