No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

22 results for “Union Carbide Corporation”, page 1 of 2

  1. Company document · Union Carbide documents · April 7, 1987

    T. L. Grittie, Industrial Hygiene Results on Asbestos Monitoring During Deinsulation of R-2 Reactor, Silanes (1987)

    Industrial hygiene results dated April 7, 1987 for breathing-zone asbestos samples taken February 10, 1987 on insulators removing insulation from reactor R-2 in the Reactor Area of Silanes inside a negative pressure enclosure. The two samples…

  2. Company document · Union Carbide documents · September 2, 1987

    L. S. Magelssen and H. W. Wegert to J. F. Dodd et al. on Status of Contingency Items for Asbestos Insulation Removal Upgrade, South Charleston (1987)

    Two-page memorandum reporting that two contingency items attached to the May 19, 1987 health, safety and environmental endorsement of the South Charleston Asbestos Insulation Removal Upgrade-Phase I had been resolved. It discusses review of the…

  3. Company document · Union Carbide documents · October 30, 1986

    H. W. Wegert and G. M. Whipple to J. R. Dement and Others on Health, Safety and Environmental Review of the South Charleston Insulation Upgrade Project (1986)

    Memorandum reporting a health, safety and environmental review of a three-year project to remove, replace and seal asbestos insulation at the South Charleston Plant. It recommends endorsement contingent on revising Maintenance Procedure XVIII to…

  4. Company document · Union Carbide documents · May 7, 1987

    G. W. Wulfert to F. E. Dailey and Others on Future Asbestos Disposal Sites at Sistersville (1987)

    Memorandum dated May 7, 1987 stating that the Sistersville plant's asbestos disposal landfill was nearing the end of its life and that a new plan was needed. It called a meeting on May 26, 1987 at 1 PM in Building 33 to develop that plan.…

  5. Company document · Union Carbide documents · October 30, 1986

    H. W. Wegert and G. M. Whipple to J. R. Dement et al. on Health, Safety, and Environmental Review of the South Charleston Insulation Upgrade Project (1986)

    Memorandum reporting a health, safety and environmental review of a three-year project to upgrade asbestos insulation at the South Charleston Plant. It recommended endorsement contingent on revising Maintenance Procedure XVIII to comply with the…

  6. Company document · Union Carbide documents · November 7, 1986

    D. A. Boggs to S. L. Curtis on Serious Asbestos Health Hazard in the Monomers North Rectification Area, Sistersville Plant (1986)

    Memo from the Sistersville Plant industrial hygienist reporting exposed, deteriorating asbestos insulation on distillation columns in the Monomers North Rectification Area and chunks of asbestos material found on the ground up to about 60 yards…

  7. Company document · Union Carbide documents · May 27, 1987

    G. W. Wulfert Minutes of the 'Future Asbestos Disposal Site(s)' Meeting, with Related Memos on the Sistersville Asbestos Landfill (1987)

    Union Carbide Sistersville, WV plant memos from May 1987 about the plant's asbestos landfill, which held asbestos insulation removed from plant equipment. The May 27 minutes record an estimate that the present landfill had about…

  8. Company document · Union Carbide documents · April 6, 1987

    T. L. Grittie Industrial Hygiene Results on Glove Bag Asbestos Insulation Removal and Transite Roof Removal (1987)

    Two Industrial Hygiene Results reports dated April 6, 1987. The first reports airborne fiber sampling of insulators removing asbestos insulation by the glove bag technique at the SSP Unit, K-36, and recommends closer scrutiny of the method. The…

  9. Company document · Union Carbide documents · December 10, 1986

    Methyls Columns Upgrade Work Package for Removal of Deteriorated Asbestos Insulation at the Sistersville, WV Plant, with Plant Asbestos Handling Procedure (1986)

    Work order package (Job 930-38037A) released 12-10-86 for stripping badly deteriorated asbestos insulation from six Methyls columns at the Sistersville plant and re-insulating some with calcium silicate. It includes a work description, insulation…

  10. Company document · Union Carbide documents · May 19, 1987

    L. S. Magelssen and H. W. Wegert to J. R. Dement and Others on Health, Safety and Environmental Review of the South Charleston Asbestos Insulation Removal Upgrade, Phase I (1987)

    A May 19, 1987 memo recommending endorsement of Phase I of a project to remove and upgrade asbestos insulation at the South Charleston plant. The endorsement is contingent on revising Maintenance Procedure XVIII to comply with OSHA 29 CFR 1926.58…

  11. Company document · Union Carbide documents · May 31, 1984

    D. A. Gosselin to John Buzzard on Laundering Asbestos-Contaminated Clothing under the OSHA Standard (1984)

    Internal Union Carbide memo in which D. A. Gosselin responded to John Buzzard's letter about laundering asbestos-contaminated clothing under OSHA Standard 1910.1001. He recommended that a letter be sent to the owner of…

  12. Company document · Union Carbide documents · September 2, 1987

    L. S. Magelssen and H. W. Wegert to J. F. Dodd and Others on Status of Contingency Items for Asbestos Insulation Removal Upgrade, South Charleston (1987)

    Memorandum reporting that two contingency items attached to the May 19, 1987 endorsement of the South Charleston asbestos insulation removal upgrade (Phase I) had been resolved. It says the February 1987 asbestos maintenance procedures were reviewed…

  13. Company document · Union Carbide documents · January 11, 1988

    K. B. Purinton to W. C. Nycz on Three Year Plant Insulation Upgrade Program, Sistersville (1988)

    Memo from K. B. Purinton at the Sistersville, WV plant setting out criteria for insulation to be included in a three-year plant insulation upgrade program, including asbestos insulation in areas of high mechanical disturbance. It states that…

  14. Company document · Union Carbide documents · March 18, 1986

    T. L. Grittie to D. A. Boggs and Others on McCrone Analysis of Jaxsan Insulation Samples at Sistersville (1986)

    Memo from T. L. Grittie transmitting McCrone Environmental Services' analysis of five Jaxsan insulation samples from the Sistersville plant. The memo reports 7-15% chrysotile asbestos, higher than the supplier had stated, and says the material…

  15. Company document · Union Carbide documents · March 18, 1986

    T. L. Grittie to D. A. Boggs and Others on McCrone Analysis of Jaxsan Insulation Samples for Asbestos (1986)

    Memo from the Sistersville plant industrial hygienist transmitting McCrone Environmental Services' analysis of five Jaxsan samples. It reports 7-15% chrysotile, higher than the supplier indicated, says the IH group will monitor insulators during…

  16. Company document · Union Carbide documents · May 19, 1987

    L. S. Magelssen and H. W. Wegert to J. R. Dement and Others on Health, Safety and Environmental Review of the Asbestos Insulation Removal Upgrade, South Charleston (1987)

    Memo recommending endorsement of Phase I of the asbestos insulation removal and upgrade project at the South Charleston plant. It notes that OSHA's 29 CFR 1926.58 rule, promulgated January 16, 1987, raised the cost of removal and repair. Endorsement…

  17. Company document · Union Carbide documents · May 31, 1984

    D. A. Gosselin to John Buzzard on Laundering Asbestos-Contaminated Clothing (1984)

    Internal correspondence in which D. A. Gosselin responded to John Buzzard's letter about laundering asbestos-contaminated clothing under OSHA Standard 1910.1001. He advised that a letter be sent to the owner of Vogue-Swift Cleaners citing the…

  18. Company document · Union Carbide documents · March 20, 1987

    C. A. Eddy to E. C. Buford and Others on March 19, 1987 Meeting Minutes, Methyls Columns Asbestos Insulation Removal at Sistersville (1987)

    Minutes, dated March 20, 1987, of a March 19, 1987 meeting at the Sistersville Plant to plan removal of asbestos insulation from six methyls columns. They list 19 items on the handling of each column, use of a negative pressure enclosure, area…

  19. Company document · Union Carbide documents · November 12, 1986

    J. L. Worstell to R. L. Foster and C. H. Hancock Forwarding EPA Notice of Deficiency on Asbestos Renovation at South Charleston Plant (1986)

    …EPA Region III Notice of Deficiency dated November 7, 1986, and Union Carbide's asbestos removal notification for the No. 19 Batch Still at the Mainland Chemicals Unit. The EPA letter stated the notice was incomplete…

  20. Company document · Union Carbide documents · July 1, 1987

    T. L. Grittie Industrial Hygiene Results on Asbestos Monitoring of Insulators (Tank Farm 4) and the Poly I Control Room (1987)

    Two industrial hygiene result sheets dated July 1, 1987, reporting asbestos air sampling done in April 1987. Page 1 covers insulators using glove bags to strip T-111 in Tank Farm 4 in Silanes, and page 2 covers the Poly I control room, where…