21 results for “Union Carbide Corporation”, page 1 of 2
-
Company document · Union Carbide documents · March 27, 1985
J. G. Roy to J. F. Dodd on the Plant Project to Eliminate Asbestos Exposure at South Charleston (1985)
Memo from J. G. Roy to J. F. Dodd about a project to eliminate asbestos exposure at the South Charleston plant, starting with the No. 2 Steam Plant. It summarizes a February 21 kickoff meeting and a meeting with an insulating contractor, objects to…
-
Company document · Union Carbide documents · September 2, 1987
L. S. Magelssen and H. W. Wegert to J. F. Dodd et al. on Status of Contingency Items for Asbestos Insulation Removal Upgrade, South Charleston (1987)
Two-page memorandum reporting that two contingency items attached to the May 19, 1987 health, safety and environmental endorsement of the South Charleston Asbestos Insulation Removal Upgrade-Phase I had been resolved. It discusses review of the…
-
Company document · Union Carbide documents · June 28, 1985
W. C. Young to Plant Managers Department on Asbestos Exposure Effects and Potential of Non-Insulator Crafts, with Plant 514 Asbestos Dust Measurement Printouts (1985)
Internal memo of June 28, 1985 from the South Charleston Plant to the Managers Department stating that plant asbestos dust measurements were below OSHA limits, but the writer questioned whether any level of inhalation exposure is safe without…
-
Company document · Union Carbide documents · October 28, 1986
T. E. Hanning to Recipient on Review of South Charleston Plant Procedures for Removal and Disposal of Asbestos Materials (1986)
Memorandum from T. E. Hanning reviewing updates to the South Charleston plant's 514 Maintenance Department procedure for handling and disposing of asbestos insulation, following the July 1986 OSHA revision. It sets out the revised exposure limit and…
-
Company document · Union Carbide documents · July 7, 1987
J. K. Corrie to H. W. Wegert and G. M. Whipple on Environmental Concerns in the South Charleston Insulation Upgrade Project, with Revised Asbestos Handling Procedure (1987)
Internal correspondence from J. K. Corrie transmitting the revised South Charleston Plant Maintenance Safety Procedure XVIII on asbestos handling. The memo says the revision addresses concerns raised in an October 30, 1986 review of the plant's…
-
Company document · Union Carbide documents · August 28, 1987
Vance E. Stover and Manhar A. Patel to A. F. Terry on Asbestos Exposure Monitoring of Insulators and Carpenters in Building 701 (1987)
Internal Union Carbide memo reporting asbestos exposure monitoring of two insulators and two carpenters during asbestos stripping and enclosure moving in Building 701 on August 17-21, 1987. It states that insulator results were above the…
-
Company document · Union Carbide documents · September 1, 1987
T. G. Huff to J. F. Dodd and Others, Project Scope Document for Building 303 Demolition, Phase III, South Charleston Plant (1987)
Project scope document for the second-stage demolition of Building 303 at the South Charleston plant, to clear space for truck trailers serving the new Drumming Center. It describes the phased work and the removal of asbestos pipe insulation and…
-
Company document · Union Carbide documents · October 30, 1986
H. W. Wegert and G. M. Whipple to J. R. Dement and Others on Health, Safety and Environmental Review of the South Charleston Insulation Upgrade Project (1986)
Memorandum reporting a health, safety and environmental review of a three-year project to remove, replace and seal asbestos insulation at the South Charleston Plant. It recommends endorsement contingent on revising Maintenance Procedure XVIII to…
-
Company document · Union Carbide documents · October 30, 1986
H. W. Wegert and G. M. Whipple to J. R. Dement et al. on Health, Safety, and Environmental Review of the South Charleston Insulation Upgrade Project (1986)
Memorandum reporting a health, safety and environmental review of a three-year project to upgrade asbestos insulation at the South Charleston Plant. It recommended endorsement contingent on revising Maintenance Procedure XVIII to comply with the…
-
Company document · Union Carbide documents · January 21, 1987
Manhar A. Patel to B. H. Avashia, M.D. and Others on Asbestos Respiratory and Medical Surveillance Requirements, with OSHA Standard Excerpts (1987)
Internal Union Carbide memo from Manhar A. Patel transmitting the respiratory protection and medical surveillance requirements of the OSHA asbestos standard for asbestos abatement jobs. It discusses medical questionnaires, six-month respirator fit tests, training, and…
-
Company document · Union Carbide documents · January 21, 1987
Manhar A. Patel to B. H. Avashia, M.D., and Others on Asbestos Respiratory and Medical Surveillance Requirements, with OSHA Standard Excerpts (1987)
A two-page Union Carbide internal memo of January 21, 1987, from Manhar A. Patel to medical, safety and engineering staff, forwarding the respirator and medical surveillance requirements of the OSHA asbestos standard for asbestos abatement…
-
Company document · Union Carbide documents · October 7, 1986
A. F. Terry to T. L. Collins and Others on Asbestos Exposure Monitoring of Steam Line Stripping, Building 726 (1986)
Internal Union Carbide memo transmitting asbestos air-monitoring results for two employees, R. P. Hess and F. R. Creech, who stripped asbestos insulation from steam lines outside and inside the Building 726 compressor room on September…
-
Company document · Union Carbide documents · April 6, 1987
Manhar A. Patel to R. E. Sergent on Asbestos Training for Services Department Personnel (1987)
Internal memo from an industrial hygienist transmitting slides used to train Services Department employees who are not routinely involved in asbestos abatement but may be exposed to asbestos in their work. The memo states that HEPA respirators are…
-
Company document · Union Carbide documents · July 15, 1987
V. E. Stover and M. A. Patel to C. W. Wible on Asbestos Exposure Monitoring of Workers Pulling Cable in Building 770 (1987)
Internal Union Carbide memo transmitting results of non-abatement asbestos exposure monitoring on two employees, J. A. Ingram and W. S. Ballingall, who pulled computer cable above ceiling tile and through service shafts in Building 770…
-
Company document · Union Carbide documents · June 25, 1986
L. G. Moody to J. F. Dodd, W. V. Summers and G. W. Wulfert Transmitting Draft Outline of Project for Sistersville Plant Insulation Upgrade (1986)
A cover memo from L. G. Moody transmits a draft Outline of Project (dated June 23, 1986) for upgrading insulation at the Sistersville, WV plant, with an estimated cost of $1,500,000 capital and $600,000 expense over three years. The outline states…
-
Company document · Union Carbide documents · May 19, 1987
L. S. Magelssen and H. W. Wegert to J. R. Dement and Others on Health, Safety and Environmental Review of the South Charleston Asbestos Insulation Removal Upgrade, Phase I (1987)
A May 19, 1987 memo recommending endorsement of Phase I of a project to remove and upgrade asbestos insulation at the South Charleston plant. The endorsement is contingent on revising Maintenance Procedure XVIII to comply with OSHA 29 CFR 1926.58…
-
Company document · Union Carbide documents · April 17, 1985
I. L. Beckett to J. F. Dodd and Others on Project Scope for Safety/Health Insulation, No. 2 Powerhouse, Building 151 (1985)
Memorandum setting out a project scope for removing, replacing or sealing deteriorated asbestos insulation in the No. 2 Powerhouse (Building 151) at South Charleston, West Virginia. It describes the capital and removal work, safety and environmental…
-
Company document · Union Carbide documents · September 2, 1987
L. S. Magelssen and H. W. Wegert to J. F. Dodd and Others on Status of Contingency Items for Asbestos Insulation Removal Upgrade, South Charleston (1987)
Memorandum reporting that two contingency items attached to the May 19, 1987 endorsement of the South Charleston asbestos insulation removal upgrade (Phase I) had been resolved. It says the February 1987 asbestos maintenance procedures were reviewed…
-
Company document · Union Carbide documents · August 17, 1987
C. W. Wible on Asbestos Exposure Monitoring of J. A. Ingram in Building 770 (1987)
Internal Union Carbide memo transmitting results of asbestos exposure monitoring done on J. A. Ingram on July 8, 1987 while he pulled computer wire above ceiling tile and through pipe chases in Building 770. The memo…
-
Company document · Union Carbide documents · September 14, 1987
Vance E. Stover and Manhar A. Patel to J. M. Kingrey on Asbestos Exposure Monitoring of Electricians Pulling Cable Above Ceilings (1987)
Internal memo from the Industrial Hygiene group reporting personal air monitoring results for four electricians who pulled cable above ceilings in Buildings 2000 and 740 in August 1987. The memo says results were below the 0.1 fiber/cc OSHA Action…