15 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · March 25, 1987

    J. K. Corrie to Maintenance Staff Transmitting Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)

    A March 25, 1987 cover memo from J. K. Corrie circulating a final review draft of Maintenance Safety Procedure XVIII, Asbestos Handling, for the South Charleston plant, with comments requested by April 3, 1987. The attached 20-page draft (dated…

  2. Company document · Union Carbide documents · June 11, 1987

    M. J. Shoger to J. K. Corrie and Others on Asbestos Enclosures and HWP Requirements Meeting (1987)

    Internal Union Carbide memo announcing a June 19 meeting, sponsored by Chuck Rotthoff, with Institute, South Charleston and Sistersville personnel on plant practices for enclosures used in asbestos removal. It states there were two close calls…

  3. Company document · Union Carbide documents · June 28, 1985

    W. C. Young to Plant Managers Department on Asbestos Exposure Effects and Potential of Non-Insulator Crafts, with Plant 514 Asbestos Dust Measurement Printouts (1985)

    Internal memo of June 28, 1985 from the South Charleston Plant to the Managers Department stating that plant asbestos dust measurements were below OSHA limits, but the writer questioned whether any level of inhalation exposure is safe without…

  4. Company document · Union Carbide documents · September 1, 1987

    T. G. Huff to J. F. Dodd and Others, Project Scope Document for Building 303 Demolition, Phase III, South Charleston Plant (1987)

    Project scope document for the second-stage demolition of Building 303 at the South Charleston plant, to clear space for truck trailers serving the new Drumming Center. It describes the phased work and the removal of asbestos pipe insulation and…

  5. Company document · Union Carbide documents · September 1, 1987

    T. G. Huff to D. J. McNeil and Others: Project Scope Document for B-303 Transitional Operation/Demolition Phase II, South Charleston Plant (1987)

    Project scope document for Building 303 transitional operation and demolition at the South Charleston Plant. It describes temporary drum-handling facilities and the removal and disposal of asbestos-containing transite siding by an abatement…

  6. Company document · Union Carbide documents · February 24, 1987

    W. J. Vincent to All Department Heads on Labelling of Asbestos Materials, with Standard Practice SH-256 on Removal and Handling of Asbestos-Containing Insulation (1987)

    A February 1987 internal memo from the South Charleston Plant Safety and Health Department told department heads that asbestos warning labels were now required on installed asbestos products whenever feasible and gave the supplier and cost. Attached…

  7. Company document · Union Carbide documents · July 22, 1987

    S. B. Kovach to D. R. Stokely Transmitting SHARE Inspection Results, South Charleston Plant (1987)

    Cover letter from the South Charleston Plant SHARE Coordinator sending D. R. Stokely the findings of a SHARE inspection held July 22, 1987, and setting program goals for correcting deficiencies. It has a 30/60/90-day progress update block and…

  8. Company document · Union Carbide documents · July 6, 1987

    Memo to J. R. Soice on Alternate Asbestos Disposal Site Bids, South Charleston Plant (1987)

    Internal memo summarizing responses to solicitations of bids from seven companies for asbestos disposal. It lists the Browning-Ferris (Marietta, Ohio), E.R.O. Landfill and Don's Disposal (Craigs Branch Landfill) sites, with prices and permit status,…

  9. Company document · Union Carbide documents · August 23, 1987

    T. G. Huff to S. W. Drake and Others: Project Scope Document for B-303 Demolition and Transite Siding Removal, South Charleston Plant (1987)

    Project scope document for demolishing part of Building 303 at the South Charleston Plant and replacing asbestos-containing transite siding on the Chemical Mixing Unit Slurry Bay with insulated metal panels. It sets out mechanical, electrical and…

  10. Company document · Union Carbide documents · January 9, 1987

    C. R. Rotthoff to W. J. Vincent on South Charleston Provisions for Asbestos Material Removal and Disposal (1987)

    Internal correspondence in which C. R. Rotthoff commented on W. J. Vincent's South Charleston asbestos removal document, saying it assumed no technology exists to keep asbestos below the PEL. He suggested identifying which steps are mandatory…

  11. Company document · Union Carbide documents · March 25, 1987

    J. K. Corrie to J. R. Dement and Others Circulating Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)

    …with handwritten routing note dated 3-25-87 and comments signed Bob Hull (UCC 019705) Clean copy of the same Corrie transmittal memo on Union Carbide Specialty Chemicals Division letterhead (UCC 019706) Maintenance Safety Manual XVIII…

  12. Company document · Union Carbide documents · January 9, 1987

    C. R. Rotthoff to W. J. Vincent Transmitting Comments on South Charleston Provisions for Asbestos Material Removal and Disposal (1987)

    Internal memo from C. R. Rotthoff to W. J. Vincent commenting on the South Charleston plant's draft asbestos removal document, suggesting that exposure be kept below the PEL where possible and that steps required because the PEL will be exceeded be…

  13. Company document · Union Carbide documents · May 22, 1985

    A. E. Wood to All Department Heads on Use of Non-Asbestos Gaskets at South Charleston (1985)

    Memorandum from A. E. Wood reporting that the GR shop had used non-asbestos gaskets on pump heads since 1983 to decrease asbestos exposure, and that inspected non-asbestos gaskets showed binder attack by process chemicals. It sets out an action plan…

  14. Company document · Union Carbide documents · October 26, 1987

    S. B. Kovach to P. R. Desai and Others Transmitting SHARE Inspection Results, South Charleston Plant (1987)

    Cover letter dated October 26, 1987 from the SHARE Coordinator at the South Charleston, West Virginia plant, sending department heads the findings of the October 14, 1987 SHARE inspection and setting a 90-day deadline to address deficiencies with…

  15. Company document · Union Carbide documents · May 7, 1987

    W. J. Vincent to J. K. Corrie on Glove Bag Usage During Removal of Damaged Asbestos Gasket (1987)

    Internal Union Carbide memo from the South Charleston Plant Safety and Health Department, following a May 4, 1987 phone conversation about removing asbestos gaskets. It states that personal exposures had been measured at or above the…