12 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · October 24, 1975
C. W. Carman to R. W. Cope and Others Circulating the Asbestos Safety Procedure for Review (1975)
A one-page cover memo from C. W. Carman to nine recipients sending an attached Asbestos Safety Procedure for approval and comments by November 5, 1975. The attachment is not included in the exhibit; the second page is blank.
-
Company document · Union Carbide documents · July 17, 1981
Industrial Hygiene Monitoring for Asbestos: R. F. Painter Report on Insulation Stripping and Bagging, Bldg. 774 (1981)
Four 'Industrial Hygiene Monitoring for Asbestos' forms (Computer Ref. W-1198), dated July 17, 1981 and stamped Business Confidential. They report AM and PM personal air samples for four workers on 07/10/81 during stripping and bagging of insulation…
-
Company document · Union Carbide documents · June 4, 1979
W. F. Blythe, Jr. to D. L. Johnson, E. C. Shipley and E. J. Tawney on Asbestos Monitoring During Insulation Removal in Building 5 at Institute (1979)
Internal Union Carbide Chemicals and Plastics memo reporting an April 30, 1979 survey of employee asbestos exposure during removal of piping insulation in Building 5 at Institute, West Virginia. One personal sample was voided and the…
-
Company document · Union Carbide documents · July 6, 1979
G. W. Bott to P. W. Young on Asbestos Exposure Survey of Insulators Stripping Old Insulation at Institute Plant (1979)
Internal Union Carbide memo reporting an industrial hygiene survey on July 2, 1979 of construction insulators stripping asbestos insulation from the #3 turbine and about thirty feet of four-inch pipe in Building 17 at the…
-
Company document · Union Carbide documents · March 29, 1979
W. F. Blythe, Jr. to D. L. Johnson, E. C. Shipley and E. J. Tawney on Asbestos Monitoring of Insulators at Institute (1979)
Internal memo reporting air sampling of construction insulators removing asbestos-containing insulation from a 3-inch steam line at the Institute, West Virginia, plant on March 17 and 19, 1979. It reported fiber concentrations of 0.7 to 3.4…
-
Company document · Union Carbide documents · March 29, 1979
W. F. Blythe, Jr. to D. L. Johnson, E. C. Shipley and E. J. Tawney on Asbestos Monitoring of Insulators at Institute, West Virginia (1979)
Internal industrial hygiene report on personal and area air sampling for asbestos during removal of insulation from a 3-inch steam line at the Institute, West Virginia plant on March 17 and 19, 1979. Results ranged from 0.2 to 3.4 fibers/cc for…
-
Company document · Union Carbide documents · June 4, 1979
Technical Center Industrial Hygiene Report to D. L. Johnson, E. C. Shipley and E. J. Tawney on Asbestos Monitoring During Insulation Removal in Building 5, Institute (1979)
Internal Union Carbide Chemicals and Plastics report on personal air sampling for asbestos during insulation removal from piping in Building 5 at Institute, West Virginia, surveyed April 30, 1979. One sample showed 1.85 fibers/cc…
-
Company document · Union Carbide documents · August 1980
Ruth Clise to R. F. Painter: Industrial Hygiene Monitoring Reports for Asbestos During Insulation Stripping in Bldg. 777 (1980)
Five 'Industrial Hygiene Monitoring for Asbestos' report forms addressed to R. F. Painter with copies to several others. They give personal air-sampling results for workers wetting, bagging and stripping insulation at Bldg. 777 on 8/18/80, 8/19/80…
-
Company document · Union Carbide documents · March 3, 1980
Technical Center IH/EP to D. L. Johnson and Others on Asbestos Monitoring at Institute #2 Powerhouse (1980)
Internal Union Carbide memo reporting a February 20, 1980 survey of employee exposure to airborne asbestos fibers during removal of boiler insulation at the #2 Powerhouse at Institute, West Virginia. Personal air samples measured 0.2…
-
Company document · Union Carbide documents · March 3, 1980
Technical Center Industrial Hygiene Report on Asbestos Monitoring During Boiler Insulation Removal at Institute #2 Powerhouse (1980)
Internal correspondence reporting personal air sampling of employees during removal of insulation from a boiler at the #2 Powerhouse at Institute, West Virginia, on February 20, 1980. Sample concentrations ranged from 0.2 to 0.8 f/cc, which the memo…
-
Company document · Union Carbide documents · March 29, 1979
W. F. Blythe, Jr. to D. L. Johnson, E. C. Shipley and E. J. Tawney on Asbestos Monitoring During Insulation Removal at Institute (1979)
Internal industrial hygiene report on air sampling of construction insulators removing asbestos insulation from a 3-inch steam line at the Institute, West Virginia plant on March 17 and 19, 1979. Personal samples ranged from 0.7 to 3.4 fibers/cc on…
-
Company document · Union Carbide documents · April 9, 1980
W. F. Blythe, Jr. to D. L. Johnson on Asbestos Monitoring at Institute #1 Powerhouse (1980)
Internal Union Carbide memo reporting an April 1980 air-monitoring survey of employees removing insulation from the #2 boiler in the Institute #1 Powerhouse. It states that personal samples ranged from 0.17 to 0.41…