You don't need the product names or old records. No fee unless we recover compensation for your family.
Cover memo from E. L. Doerflein to L. E. Calvert forwarding the Sistersville Plant's asbestos handling procedure and insulation philosophy for a group developing a recommended C&P asbestos policy. It states that asbestos insulation purchases stopped in 1973 and there were no plans to phase out asbestos gaskets or packing. Attached are a Feb. 1986 memo, the insulation philosophy, a safety and health procedure for handling asbestos, and an audit checklist.
- Author
- E. L. Doerflein (Union Carbide Specialty Chemicals, Sistersville Plant (author of cover memo)); G. W. Wulfert (Maintenance Manager (author of Feb. 5, 1986 memo))
- Published by
- Union Carbide Corporation, Specialty Chemicals, Sistersville Plant
- Series
- Union Carbide documents, UC-4076
- Date
- July 24, 1986
- Number
- Bates UCC 022444 to UCC 022452
- Library no.
- ACL Doc 18690 · asbestosclaims.law/library/18690
- Rights
- A document from asbestos litigation, published for research and historical study.
Read or download
Read online Download the PDF Document UC-4076 · 10 pages · 366 KB
What the document holds
- Page 1: Memo, E. L. Doerflein to L. E. Calvert, July 24, 1986, Asbestos Handling - Sistersville
- Page 2: Memo, G. W. Wulfert to department heads and maintenance, Feb. 5, 1986, Asbestos Insulation Philosophy
- Pages 3-4: Sistersville Plant philosophies and guidelines for asbestos insulation (2 pages)
- Pages 5-8: Safety and Health Procedures Manual Section II-13: handling, installing, removing and disposing of asbestos material
- Page 9: Audit checklist for removal and handling of asbestos materials
- Page 10: Page 10 has no OCR text
People and organizations
From E. L. Doerflein (Union Carbide Specialty Chemicals, Sistersville Plant (author of cover memo)); G. W. Wulfert (Maintenance Manager (author of Feb. 5, 1986 memo)) to L. E. Calvert; All Department Heads, Maintenance 2nd Line, Maintenance 1st Line, Operations Department Coordinators (recipients of the Feb. 5, 1986 memo).
- Edmond L. Doerflein (author)
- George W. Wulfert (author)
- Larry E. Calvert (recipient)
- Sistersville Plant (its organization)
- Union Carbide Corporation (its organization)
- EPA (named)
- International Association of Heat and Frost Insulators and Asbestos Workers (named)
- Maintenance Department (named)
- Safety and Health Department (named)
Related pages
Pages on our site about what this document covers: Asbestos Gaskets and Mechanical Packing · EPA · West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.
About this copy
This is document UC-4076 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 10 pages. Production numbers UCC 022444 to UCC 022452.
Cite this document
E. L. Doerflein (Union Carbide Specialty Chemicals, Sistersville Plant (author of cover memo)), G. W. Wulfert (Maintenance Manager (author of Feb. 5, 1986 memo)). “E. L. Doerflein to L. E. Calvert Transmitting Sistersville Plant Asbestos Handling Procedure and Insulation Philosophy.” July 24, 1986. Union Carbide documents, UC-4076, Bates UCC 022444 to UCC 022452. Union Carbide Corporation, Specialty Chemicals, Sistersville Plant. AsbestosClaims.Law Library, ACL Doc 18690. https://asbestosclaims.law/library/18690.
ACL Doc numbers and their short links never change. See how to cite the Library.
Talk with an asbestos lawyer
Start with what you remember, and we'll take it from there.
This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.