A three-page supplemental appropriation request of January 7, 1957, from the Industrial Engineering Department of J-M's Manville, New Jersey, factory, for $1,937 more to improve dust control at the shingle and Transite forming machines, where a newly installed dust collecting system had proved "inadequate at five locations." Dust at the shingle forming machine, the report says, was asbestos fiber, silica, cement and Traprock, "a serious exposure": concentrations were above J-M's 5 million particles per cubic foot standard and free silica was "over the 5% maximum allowable." With it is a May 24, 1955, memo from J. M. Joyce saying that because of higher production schedules, work on the dust system could be done only on Sundays, pushing completion from June 30 to September 30.
- Published by
- Johns-Manville
- Date
- January 7, 1957
- Rights
- Republished under fair use for research and historical study.
Read or download
Read online Download the PDF Industrial Engineering report, January 7, 1957 · 3 pages · 129 KB
Read online Download the PDF Memo, May 24, 1955: dust control work limited to Sundays · 1 pages · 42 KB
What it shows
The report weighs the cost of the fix against the cost of claims: "A disability resulting from this exposure is compensable in the approximate amount of $18,000 for total disability plus litigation and medical examination costs" under New Jersey's workers' compensation law, and "to avoid costly consequences of continuing with inadequate equipment" early approval was recommended. It names five men working at the No. 3 forming machine, which ran eight or more hours a day. Together the two papers show dust control at Manville being scheduled around production and justified in part by compensation costs.
In Johns-Manville's chronology
Johns-Manville's own chronology of what the company knew describes this document as follows:
In a memorandum dated 1/7/57, the Industrial Engineering Department (Manville) recommends improvement of dust controls to reduce high dust counts. In an attached letter dated 5/24/55, J.M. Joyce (Manville) states that to achieve a necessary increase in production schedules, work on the dust control system can be done only on Sundays when the machines are down. If this situation continues, the completion date will need to be pushed back from June 30 to September 30.
Cited on this site
Cite this document
“J-M Manville Industrial Engineering Report on Replacing Dust Control at the Shingle and Transite Forming Machines.” January 7, 1957. Johns-Manville. AsbestosClaims.Law Library. https://asbestosclaims.law/library/documents/j-m-manville-industrial-engineering-report-on-replacing-dust-control-at-the-shingle-and-transite-forming-machines-1957.
ACL Doc numbers and their short links never change. See how to cite the Library.
Talk with an asbestos lawyer
Start with what you remember, and we'll take it from there.
This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.