53 results for “Union Carbide Corporation”, page 1 of 3
-
Company document · Union Carbide documents · October 5, 1979
Bill Lett to C. R. Johnson and E. C. Shipley on Work Done on a Pipeline Hanging Project (1979)
A one-page handwritten note dated Oct. 5, 1979, from Bill Lett to Mr. C. R. Johnson and Mr. E. C. Shipley, marked 'Re: See Attached'. The writer said that he and Homer walked a line before the job, identified the work and procedures, and contacted…
-
Company document · Union Carbide documents · September 12, 1980
G. F. Hurley to B. E. Bess and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)
Letter reporting asbestos air monitoring in the SEVIN operations area on September 3, 1980, which showed 0.1 fiber per cc. Six breathing-zone samples were taken on three men, but an analytical error left only one valid sample, for Mr. Smith. The…
-
Company document · Union Carbide documents · September 12, 1980
G. F. Hurley to B. E. Bess, P. W. Young and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)
Letter reporting that asbestos monitoring in the SEVIN operations area on September 3, 1980 showed 0.1 fiber per cc, which it described as below the present OSHA standard. Six breathing-zone samples were taken on three men, but because of an…
-
Company document · Union Carbide documents · March 19, 1982
Industrial Hygiene Monitoring for Asbestos, Building 701-100 Insulation Cleanup, Reported to J. E. Midkiff (1982)
Four pages of Union Carbide industrial hygiene monitoring reports (computer refs. W-1401, W-1402, W-1405) dated March 19, 1982, giving airborne asbestos fiber results for workers Warren Abbot, Paul Crowder and Dave Shamblin during…
-
Company document · Union Carbide documents · October 24, 1975
C. W. Carman to R. W. Cope and Others Circulating the Asbestos Safety Procedure for Review (1975)
A one-page cover memo from C. W. Carman to nine recipients sending an attached Asbestos Safety Procedure for approval and comments by November 5, 1975. The attachment is not included in the exhibit; the second page is blank.
-
Company document · Union Carbide documents · November 16, 1979
Technical Center IH/EP (Ruth Clise) to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse (1979)
Internal industrial hygiene report on air sampling done October 26, 1979 while Construction workers stripped and bagged asbestos-containing insulation from an exhaust duct in the Building 704 Powerhouse in South Charleston. It reports that dust on…
-
Company document · Union Carbide documents · March 25, 1987
J. K. Corrie to Maintenance Staff Transmitting Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)
A March 25, 1987 cover memo from J. K. Corrie circulating a final review draft of Maintenance Safety Procedure XVIII, Asbestos Handling, for the South Charleston plant, with comments requested by April 3, 1987. The attached 20-page draft (dated…
-
Company document · Union Carbide documents · December 17, 1986
R. L. Foster to Distribution on Reissuing EPA Asbestos Removal Notification Reminder, with 1984 Memorandum and Notification Forms (1986)
…13, 1984 Union Carbide memo clarifying prior notification for renovation of friable asbestos, with blanket notification form letter (Form C) Law Department memo on notification of demolition or renovation of friable asbestos material under 40 CFR…
-
Company document · Union Carbide documents · July 17, 1981
Industrial Hygiene Monitoring for Asbestos: R. F. Painter Report on Insulation Stripping and Bagging, Bldg. 774 (1981)
Four 'Industrial Hygiene Monitoring for Asbestos' forms (Computer Ref. W-1198), dated July 17, 1981 and stamped Business Confidential. They report AM and PM personal air samples for four workers on 07/10/81 during stripping and bagging of insulation…
-
Company document · Union Carbide documents · July 16, 1982
Manhar A. Patel to J. C. Smith on Dust and MEK Monitoring in the Sandblast Shed, 511 Construction Institute Plant (1982)
Internal Union Carbide letter reporting dust sampling for 'Black Beauty' in the Sandblast Shed and methyl ethyl ketone (MEK) sampling in the Paint Preparation Shed at the 511 Construction Institute Plant, May-June 1982. It says…
-
Company document · Union Carbide documents · June 4, 1979
W. F. Blythe, Jr. to D. L. Johnson, E. C. Shipley and E. J. Tawney on Asbestos Monitoring During Insulation Removal in Building 5 at Institute (1979)
Internal Union Carbide Chemicals and Plastics memo reporting an April 30, 1979 survey of employee asbestos exposure during removal of piping insulation in Building 5 at Institute, West Virginia. One personal sample was voided and the…
-
Company document · Union Carbide documents · August 25, 1977
W. F. Blythe, Jr. to A. S. Howard and Others on Asbestos Air Sampling During Insulation Removal at Institute Powerhouse (1977)
Internal memo reporting air samples taken August 15, 1977 during removal of possibly asbestos-containing insulation at the Institute, West Virginia powerhouse. It reports personal sample concentrations of 2.59 and 2.61 fibers/cc and an area sample…
-
Company document · Union Carbide documents · September 1, 1987
T. G. Huff to J. F. Dodd and Others, Project Scope Document for Building 303 Demolition, Phase III, South Charleston Plant (1987)
Project scope document for the second-stage demolition of Building 303 at the South Charleston plant, to clear space for truck trailers serving the new Drumming Center. It describes the phased work and the removal of asbestos pipe insulation and…
-
Company document · Union Carbide documents · April 1, 1987
Dennis H. Hanshew to J. K. Corrie on Review of Maintenance Safety Procedure XVIII, Asbestos Handling (1987)
Memo in which the Environmental Protection Department reviewed the South Charleston Plant's Asbestos Handling Procedure (Maintenance Safety Procedure XVIII) and gave two comments. It asked that "and signed" be deleted from a sentence on page 16 and…
-
Company document · Union Carbide documents · September 1, 1987
T. G. Huff to D. J. McNeil and Others: Project Scope Document for B-303 Transitional Operation/Demolition Phase II, South Charleston Plant (1987)
Project scope document for Building 303 transitional operation and demolition at the South Charleston Plant. It describes temporary drum-handling facilities and the removal and disposal of asbestos-containing transite siding by an abatement…
-
Company document · Union Carbide documents · July 6, 1979
G. W. Bott to P. W. Young on Asbestos Exposure Survey of Insulators Stripping Old Insulation at Institute Plant (1979)
Internal Union Carbide memo reporting an industrial hygiene survey on July 2, 1979 of construction insulators stripping asbestos insulation from the #3 turbine and about thirty feet of four-inch pipe in Building 17 at the…
-
Company document · Union Carbide documents · March 5, 1979
G. F. Hurley to E. C. Shipley on Medical Examinations Under the OSHA Asbestos Standard, with OSHA Program Directive #300-16 (1979)
A March 5, 1979 internal letter from industrial hygienist G. F. Hurley to E. C. Shipley at the Institute Plant forwarding an OSHA administrative interpretation of the medical examination requirements of the asbestos standard. The letter states that…
-
Company document · Union Carbide documents · August 25, 1977
W. F. Blythe, Jr. to A. S. Howard and Others on Asbestos Monitoring at the Institute Powerhouse (1977)
Internal memo reporting air sampling on August 15, 1977 during removal of insulation possibly containing asbestos at the Institute, West Virginia powerhouse. It reports two personal samples (2.59 and 2.61 fibers/cc) and one area sample (0.48…
-
Company document · Union Carbide documents · April 19, 1982
Randy Noble to T. L. Crouch, E. C. Shipley and E. J. Tawney on Supervisor's Reports for Asbestos Insulation Removal and Disposal (1982)
A one-page memorandum from the Safety Administrator at Central Engineering, South Charleston, West Virginia, stating that the Insulator Supervisor must complete the attached report for every asbestos removal job under the company's removal and…
-
Company document · Union Carbide documents · March 29, 1979
W. F. Blythe, Jr. to D. L. Johnson, E. C. Shipley and E. J. Tawney on Asbestos Monitoring of Insulators at Institute (1979)
Internal memo reporting air sampling of construction insulators removing asbestos-containing insulation from a 3-inch steam line at the Institute, West Virginia, plant on March 17 and 19, 1979. It reported fiber concentrations of 0.7 to 3.4…