30 results for “Union Carbide Corporation”, page 1 of 2
-
Company document · Union Carbide documents · October 20, 1986
Memo to J. K. Corrie on Asbestos Disposal at Goff Mountain and a Parkersburg Landfill, South Charleston Plant (1986)
Memo dated October 20, 1986, from the Environmental Protection department at the South Charleston Plant to J. K. Corrie, with copies to several staff. It says Goff Mountain is close to banning asbestos disposal, names a Parkersburg landfill as the…
-
Company document · Union Carbide documents · March 25, 1987
J. K. Corrie to Maintenance Staff Transmitting Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)
A March 25, 1987 cover memo from J. K. Corrie circulating a final review draft of Maintenance Safety Procedure XVIII, Asbestos Handling, for the South Charleston plant, with comments requested by April 3, 1987. The attached 20-page draft (dated…
-
Company document · Union Carbide documents · June 11, 1987
M. J. Shoger to J. K. Corrie and Others on Asbestos Enclosures and HWP Requirements Meeting (1987)
Internal Union Carbide memo announcing a June 19 meeting, sponsored by Chuck Rotthoff, with Institute, South Charleston and Sistersville personnel on plant practices for enclosures used in asbestos removal. It states there were two close calls…
-
Company document · Union Carbide documents · December 17, 1986
R. L. Foster to Distribution on Reissuing EPA Asbestos Removal Notification Reminder, with 1984 Memorandum and Notification Forms (1986)
…13, 1984 Union Carbide memo clarifying prior notification for renovation of friable asbestos, with blanket notification form letter (Form C) Law Department memo on notification of demolition or renovation of friable asbestos material under 40 CFR…
-
Company document · Union Carbide documents · September 25, 1986
W. J. Vincent to J. K. Corrie and Others on the New Asbestos Construction Standard (1986)
A September 1986 memo from W. J. Vincent transmitting a summary of the new OSHA Asbestos Construction Industry Standard. The attached summary covers the 0.2 f/cc permissible exposure limit, the 0.1 f/cc action level, monitoring, respirators,…
-
Company document · Union Carbide documents · February 11, 1987
W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement and Removal Questions, South Charleston Plant (1987)
Internal Union Carbide memo from W. J. Vincent to J. K. Corrie forwarding answers to questions raised at a recent meeting on asbestos abatement and removal. The attached "Asbestos Management" Q&A covers negative pressure enclosures…
-
Company document · Union Carbide documents · September 1, 1987
T. G. Huff to J. F. Dodd and Others, Project Scope Document for Building 303 Demolition, Phase III, South Charleston Plant (1987)
Project scope document for the second-stage demolition of Building 303 at the South Charleston plant, to clear space for truck trailers serving the new Drumming Center. It describes the phased work and the removal of asbestos pipe insulation and…
-
Company document · Union Carbide documents · April 1, 1987
Dennis H. Hanshew to J. K. Corrie on Review of Maintenance Safety Procedure XVIII, Asbestos Handling (1987)
Memo in which the Environmental Protection Department reviewed the South Charleston Plant's Asbestos Handling Procedure (Maintenance Safety Procedure XVIII) and gave two comments. It asked that "and signed" be deleted from a sentence on page 16 and…
-
Company document · Union Carbide documents · September 1, 1987
T. G. Huff to D. J. McNeil and Others: Project Scope Document for B-303 Transitional Operation/Demolition Phase II, South Charleston Plant (1987)
Project scope document for Building 303 transitional operation and demolition at the South Charleston Plant. It describes temporary drum-handling facilities and the removal and disposal of asbestos-containing transite siding by an abatement…
-
Company document · Union Carbide documents · July 8, 1987
W. J. Vincent Industrial Hygiene Summary of Asbestos Air Sampling in Pipe Chases, Building 82, for W. K. White (1987)
Five-page set of industrial hygiene records for an asbestos air-sampling survey on 06/22/87 in the pipe chases of Building 82 (plant location 327000). It has a handwritten field data sheet, two summary forms dated 07/08/87 from W. J. Vincent, and…
-
Company document · Union Carbide documents · December 31, 1985
J. G. Roy Memoranda and Work Plan on Asbestos Removal at the No. 2 Steam Plant, South Charleston (1985)
Two memoranda from J. G. Roy, the first dated December 31, 1985, transmitting a plan to remove asbestos from idle facilities in the No. 2 Steam Plant and the second sending the work plan and a contractor sign-in form to the ES supervisors. The…
-
Company document · Union Carbide documents · July 6, 1987
Memo to J. R. Soice on Alternate Asbestos Disposal Site Bids, South Charleston Plant (1987)
Internal memo summarizing responses to solicitations of bids from seven companies for asbestos disposal. It lists the Browning-Ferris (Marietta, Ohio), E.R.O. Landfill and Don's Disposal (Craigs Branch Landfill) sites, with prices and permit status,…
-
Company document · Union Carbide documents · February 11, 1987
W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement Questions, South Charleston Plant (1987)
Internal Union Carbide memo from W. J. Vincent to J. K. Corrie, stamped received by the Maintenance Department on Feb. 17, 1987, forwarding answers to questions on asbestos raised at a recent meeting on asbestos abatement…
-
Company document · Union Carbide documents · August 23, 1987
T. G. Huff to S. W. Drake and Others: Project Scope Document for B-303 Demolition and Transite Siding Removal, South Charleston Plant (1987)
Project scope document for demolishing part of Building 303 at the South Charleston Plant and replacing asbestos-containing transite siding on the Chemical Mixing Unit Slurry Bay with insulated metal panels. It sets out mechanical, electrical and…
-
Company document · Union Carbide documents · November 7, 1986
J. F. Dodd to D. A. Gosselin and Others Transmitting the South Charleston Plant Insulation Asbestos Upgrade Outline of Project (1986)
Cover memo dated November 7, 1986 transmitting for review an Outline of Project for a plantwide asbestos insulation upgrade at the South Charleston, WV plant, described as a high-priority Safety/Health Program. The attached outline describes the…
-
Company document · Union Carbide documents · August 23, 1976
B. L. Murray to J. H. Murray on Potential Asbestos Exposure from South Charleston Plant Storeroom Materials, with Attached Data Sheet and Plant Stores Sampling Report (1976)
…H. Murray on potential asbestos exposure in plant storerooms (Buildings 307-1 and 8-505) Union Carbide Chemicals and Plastics Division Environmental Health Data Sheet for asbestos (chrysotile), South Charleston Plant Industrial hygiene memo dated July…
-
Company document · Union Carbide documents · September 11, 1986
Internal Memo to J. L. Worstell and R. J. Romagnoli on Asbestos and Spent Solvent Disposal at Goff Mountain Landfill (1986)
Internal Union Carbide memo dated September 11, 1986, on environmental protection, addressed to "Jack & Ron" with copies to F. L. Boggs and L. H. DuPuy. It says the Goff Mountain Landfill was close to banning asbestos…
-
Company document · Union Carbide documents · May 6, 1987
D. H. Hanshew to J. R. Dement on Environmental Concerns about the South Charleston Plant Insulation Upgrade Project and Asbestos Handling Procedure (1987)
Memo responding to a 10-30-86 memo from H. W. Wegert and G. M. Whipple about the Health, Safety, and Environmental Review of the South Charleston insulation upgrade project. It addresses three concerns about notification, disposal container labels…
-
Company document · Union Carbide documents · February 18, 1987
W. J. Vincent to J. K. Corrie Transmitting Revised Asbestos Maintenance Procedure, South Charleston Plant (1987)
A one-page internal memo from W. J. Vincent to J. K. Corrie transmitting a revised Asbestos Maintenance Procedure for the South Charleston Plant, revised to comply with the new asbestos construction standard. The attached 18-page draft, 'Provisions…
-
Company document · Union Carbide documents · March 27, 1987
Memo to J. L. Worstell on Possibility of Using the Sistersville Plant for Asbestos Disposal (1987)
Memo summarizing a telephone call to Bob Newberger, an Environmental Protection staff member at the Sistersville facility, about using that facility to dispose of waste asbestos. It reports how Sistersville handled its own asbestos waste and that…