41 results for “Union Carbide Corporation”, page 1 of 3
-
Company document · Union Carbide documents · September 5, 1986
T. E. Hanning to S. W. Clark and Others on Asbestos Update: Union Support for Proposed EPA Ban (1986)
…marked 'For Your Information', reporting that labor unions were endorsing a proposed EPA asbestos ban and contending that OSHA's 0.2 fiber/cc limit gave insufficient worker protection. It also summarizes the proposed EPA rule…
-
Company document · Union Carbide documents · March 21, 1984
G. D. Twait to Wayne Williams on November 1983 Revisions to SH-256, Removal and Handling of Asbestos-Containing Insulation Material (1984)
A handwritten 1984 note from G. D. Twait to Wayne Williams confirming that the asbestos permissible exposure limit in the November 1983 revision of SH-256 would stay at 0.5 fibers/cc, with attached material. The attachments are the OSHA emergency…
-
Company document · Union Carbide documents · June 24, 1987
S. B. Kovach to L. C. Stewart Transmitting South Charleston Plant SHARE Inspection Results, with Audit Team Reports (1987)
A June 24, 1987 cover letter from the South Charleston Plant SHARE Coordinator to L. C. Stewart forwarding findings of a SHARE safety inspection held that day. It sets goals of addressing all deficiencies within 90 days and sending 30-day progress…
-
Company document · Union Carbide documents · March 25, 1987
J. K. Corrie to Maintenance Staff Transmitting Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)
A March 25, 1987 cover memo from J. K. Corrie circulating a final review draft of Maintenance Safety Procedure XVIII, Asbestos Handling, for the South Charleston plant, with comments requested by April 3, 1987. The attached 20-page draft (dated…
-
Company document · Union Carbide documents · September 2, 1987
L. S. Magelssen and H. W. Wegert to J. F. Dodd et al. on Status of Contingency Items for Asbestos Insulation Removal Upgrade, South Charleston (1987)
Two-page memorandum reporting that two contingency items attached to the May 19, 1987 health, safety and environmental endorsement of the South Charleston Asbestos Insulation Removal Upgrade-Phase I had been resolved. It discusses review of the…
-
Company document · Union Carbide documents · June 28, 1985
W. C. Young to Plant Managers Department on Asbestos Exposure Effects and Potential of Non-Insulator Crafts, with Plant 514 Asbestos Dust Measurement Printouts (1985)
Internal memo of June 28, 1985 from the South Charleston Plant to the Managers Department stating that plant asbestos dust measurements were below OSHA limits, but the writer questioned whether any level of inhalation exposure is safe without…
-
Company document · Union Carbide documents · May 6, 1987
S. B. Kovach to L. C. Stewart Transmitting SHARE Inspection Results, South Charleston Plant (1987)
Cover letter from the South Charleston Plant SHARE coordinator sending L. C. Stewart the findings of a May 6, 1987 SHARE safety/health inspection. The letter sets a 90-day deadline to address deficiencies and requires 30-day progress updates. The…
-
Company document · Union Carbide documents · October 28, 1986
T. E. Hanning to Recipient on Review of South Charleston Plant Procedures for Removal and Disposal of Asbestos Materials (1986)
Memorandum from T. E. Hanning reviewing updates to the South Charleston plant's 514 Maintenance Department procedure for handling and disposing of asbestos insulation, following the July 1986 OSHA revision. It sets out the revised exposure limit and…
-
Company document · Union Carbide documents · October 30, 1986
H. W. Wegert and G. M. Whipple to J. R. Dement and Others on Health, Safety and Environmental Review of the South Charleston Insulation Upgrade Project (1986)
Memorandum reporting a health, safety and environmental review of a three-year project to remove, replace and seal asbestos insulation at the South Charleston Plant. It recommends endorsement contingent on revising Maintenance Procedure XVIII to…
-
Company document · Union Carbide documents · September 3, 1987
S. B. Kovach to S. J. Chanley transmitting South Charleston Plant SHARE Inspection Results, with Distribution Department audit report (1987)
A September 3, 1987 cover letter from the South Charleston Plant SHARE coordinator to S. J. Chanley transmitting findings of a SHARE inspection, stating that deficiencies must be addressed within 90 days and progress updates sent every 30 days. The…
-
Company document · Union Carbide documents · October 30, 1986
H. W. Wegert and G. M. Whipple to J. R. Dement et al. on Health, Safety, and Environmental Review of the South Charleston Insulation Upgrade Project (1986)
Memorandum reporting a health, safety and environmental review of a three-year project to upgrade asbestos insulation at the South Charleston Plant. It recommended endorsement contingent on revising Maintenance Procedure XVIII to comply with the…
-
Company document · Union Carbide documents · September 1, 1987
T. G. Huff to D. J. McNeil and Others: Project Scope Document for B-303 Transitional Operation/Demolition Phase II, South Charleston Plant (1987)
Project scope document for Building 303 transitional operation and demolition at the South Charleston Plant. It describes temporary drum-handling facilities and the removal and disposal of asbestos-containing transite siding by an abatement…
-
Company document · Union Carbide documents · February 1, 1984
C. A. McNeill to J. B. Mickey Transmitting Draft Safety and Health Requirements for Contractors, Sistersville Plant (1984)
A February 1, 1984 cover memo from C. A. McNeill to J. B. Mickey attaching a draft package of three documents on safety and health requirements for contractors at the Sistersville Plant. The package includes contractor rules, a list of potential…
-
Company document · Union Carbide documents · June 10, 1987
S. B. Kovach to R. W. Decrease transmitting SHARE Inspection Results, South Charleston Plant (1987)
Cover letter from the South Charleston Plant SHARE coordinator sending the findings of a SHARE inspection held June 10, 1987, and setting goals of addressing all deficiencies within 90 days and sending progress updates every 30 days. The attached…
-
Company document · Union Carbide documents · July 29, 1987
S. B. Kovach to T. G. Swanson Transmitting SHARE Inspection Results, with Audit Team Reports, South Charleston Plant (1987)
Cover letter from the SHARE Coordinator at the South Charleston Plant to T. G. Swanson transmitting findings of a SHARE inspection held July 29, 1987. It sets a 90-day deadline to address deficiencies and 30-day progress updates. Three attached…
-
Company document · Union Carbide documents · February 24, 1987
W. J. Vincent to All Department Heads on Labelling of Asbestos Materials, with Standard Practice SH-256 on Removal and Handling of Asbestos-Containing Insulation (1987)
A February 1987 internal memo from the South Charleston Plant Safety and Health Department told department heads that asbestos warning labels were now required on installed asbestos products whenever feasible and gave the supplier and cost. Attached…
-
Company document · Union Carbide documents · July 8, 1987
W. J. Vincent Industrial Hygiene Summary of Asbestos Air Sampling in Pipe Chases, Building 82, for W. K. White (1987)
Five-page set of industrial hygiene records for an asbestos air-sampling survey on 06/22/87 in the pipe chases of Building 82 (plant location 327000). It has a handwritten field data sheet, two summary forms dated 07/08/87 from W. J. Vincent, and…
-
Company document · Union Carbide documents · November 7, 1986
D. A. Boggs to S. L. Curtis on Serious Asbestos Health Hazard in the Monomers North Rectification Area, Sistersville Plant (1986)
Memo from the Sistersville Plant industrial hygienist reporting exposed, deteriorating asbestos insulation on distillation columns in the Monomers North Rectification Area and chunks of asbestos material found on the ground up to about 60 yards…
-
Company document · Union Carbide documents · September 30, 1987
S. B. Kovach to L. C. Stewart Transmitting SHARE Inspection Results, South Charleston Plant (1987)
Cover letter from the South Charleston Plant SHARE coordinator sending L. C. Stewart the findings of a SHARE inspection held September 30, 1987. It sets the program goals of addressing all deficiencies within 90 days and sending progress updates…
-
Company document · Union Carbide documents · July 22, 1987
S. B. Kovach to D. R. Stokely Transmitting SHARE Inspection Results, South Charleston Plant (1987)
Cover letter from the South Charleston Plant SHARE Coordinator sending D. R. Stokely the findings of a SHARE inspection held July 22, 1987, and setting program goals for correcting deficiencies. It has a 30/60/90-day progress update block and…