  1. Company document · Union Carbide documents · January 23, 1985

    C. E. Fry to D. D. Templeton Transmitting 1983-1984 Asbestos Monitoring Data, South Charleston Plant 514 (1985)

    Internal memo dated January 23, 1985 transmitting all asbestos measurements made in 1983 and 1984 at the South Charleston plant. It explains the blank job-class entries and the 1.00 eight-hour TWA values, and attaches computer printouts of…

  2. Company document · Union Carbide documents · August 25, 1977

    W. F. Blythe, Jr. to D. R. Paugh and Others on Asbestos Air Monitoring at the South Charleston Plant (1977)

    Internal Union Carbide memo reporting air sampling done on August 8, 1977 during removal of wet insulation, possibly containing asbestos, from a furnace at the South Charleston mainland powerhouse. It states that the results complied with…

  3. Company document · Union Carbide documents · January 23, 1985

    C. E. Fry to D. D. Templeton on Asbestos Measurements Made in 1983 and 1984 (1985)

    One-page internal Union Carbide memo from C. E. Fry to D. D. Templeton, sent with an attachment of the asbestos measurements made in 1983 and 1984. It explains how to read the 'Job Class. Code…

  4. Company document · Union Carbide documents · March 4, 1986

    D. H. Ott to J. R. Dement and S. Rossi on Tank Insulation in 1986, with Tank Insulation Needs Table (1986)

    A March 4, 1986 memo from D. H. Ott to J. R. Dement and S. Rossi about the 1986 budget for tank insulation and weatherproofing work in Polyols, noting two tanks were started in 1985 because of the need to remove damaged asbestos insulation. The…

  5. Company document · Union Carbide documents · November 7, 1986

    J. F. Dodd to D. A. Gosselin and Others Transmitting the South Charleston Plant Insulation Asbestos Upgrade Outline of Project (1986)

    Cover memo dated November 7, 1986 transmitting for review an Outline of Project for a plantwide asbestos insulation upgrade at the South Charleston, WV plant, described as a high-priority Safety/Health Program. The attached outline describes the…

  6. Company document · Union Carbide documents · August 23, 1976

    B. L. Murray to J. H. Murray on Potential Asbestos Exposure from South Charleston Plant Storeroom Materials, with Attached Data Sheet and Plant Stores Sampling Report (1976)

    …H. Murray on potential asbestos exposure in plant storerooms (Buildings 307-1 and 8-505) Union Carbide Chemicals and Plastics Division Environmental Health Data Sheet for asbestos (chrysotile), South Charleston Plant Industrial hygiene memo dated July…

  7. Company document · Union Carbide documents · May 13, 1986

    Joseph F. Dodd to J. R. Dement and S. Rossi on the South Charleston Plant Asbestos Insulation Upgrade Project, with Draft Outline of Project (1986)

    A May 13, 1986 cover memo from Joseph F. Dodd transmitting a draft Outline of Project for a plant-wide asbestos insulation upgrade at the South Charleston, WV plant. The memo and draft describe a $4.5 million, three-year project to remove asbestos…

  8. Company document · Union Carbide documents · 1986

    Asbestos Handling and Asbestos Removal/Disposal Checklists for Insulation Removal Jobs, East Tank Farm and Other Plant Areas (1985-1986)

    A set of plant checklist forms recording jobs in which asbestos insulation was removed, mostly in May and June 1986, with a few forms dated May 1985. Each form gives the date, job description, estimated quantity removed, location (for example Area…

  9. Company document · Union Carbide documents · May 13, 1986

    Joseph F. Dodd to J. R. Dement and S. Rossi Transmitting Draft Outline of Project for South Charleston Plant Asbestos Insulation Upgrade (1986)

    A cover memo from Joseph F. Dodd transmitting a draft Outline of Project for a plant-wide asbestos insulation upgrade at the South Charleston, WV plant, followed by the draft outline. The outline describes the scope, a three-year schedule through…

  10. Company document · Union Carbide documents · July 26, 1985

    W. E. Ballard to R. G. Link on Asbestos Insulation at the South Charleston Plant (1985)

    Internal memo reporting a follow-up with Corporate HS&EA on removing asbestos insulation at plant facilities. It states the corporation has no requirements beyond government regulations, summarizes the asbestos programs at Seadrift and Institute, and…

  11. Company document · Union Carbide documents · May 15, 1985

    D. J. McNeil to W. E. Ballard and Others on Use of Asbestos/Non-Asbestos Gasket and Valve Packing Materials at South Charleston (1985)

    Memorandum reporting a 5/10/85 meeting on use of asbestos and non-asbestos gasket and valve packing materials at the South Charleston location. It records the earlier effort to discontinue asbestos materials after the health concern, the E&TS…

  12. Company document · Union Carbide documents · November 7, 1986

    J. F. Dodd to D. A. Gosselin and Others Transmitting the South Charleston Plant Insulation Asbestos Upgrade Outline of Project (1986)

    A November 7, 1986 transmittal memo from Joseph F. Dodd circulating the Outline of Project for a plantwide asbestos insulation upgrade at the South Charleston Plant, with a handwritten note asking who would perform the work. The attached outline…

  13. Company document · Union Carbide documents · November 2, 1983 · page 1

    C. R. Gillespie to T. G. Swanson on Removal of Asbestos-Covered 3-Inch Line, Building 303 (1983)

    In the document: …Young {Safety Dept.} the insulation removal from the pipe was done in an expert manner. The job uns monitored by the Safety Dept. UCC 003279 Union Carbide trial exhibit UC-2351: C. R. Gillespie to T…