27 results for “Union Carbide Corporation”, page 1 of 2
-
Company document · Union Carbide documents · June 24, 1987
S. B. Kovach to L. C. Stewart Transmitting South Charleston Plant SHARE Inspection Results, with Audit Team Reports (1987)
A June 24, 1987 cover letter from the South Charleston Plant SHARE Coordinator to L. C. Stewart forwarding findings of a SHARE safety inspection held that day. It sets goals of addressing all deficiencies within 90 days and sending 30-day progress…
-
Company document · Union Carbide documents · April 29, 1986
D. R. Stokely to Dr. D. L. Liebeskind Transmitting Action Plan for the South Charleston Chemical Mixing Dept. Safety/Health Survey (1986)
Internal Union Carbide memo from the South Charleston Plant transmitting an action plan that responds to concerns raised in the July 15-19, 1985 operational safety/health survey of the Chemical Mixing Department (514). It lists…
-
Company document · Union Carbide documents · March 25, 1987
J. K. Corrie to Maintenance Staff Transmitting Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)
A March 25, 1987 cover memo from J. K. Corrie circulating a final review draft of Maintenance Safety Procedure XVIII, Asbestos Handling, for the South Charleston plant, with comments requested by April 3, 1987. The attached 20-page draft (dated…
-
Company document · Union Carbide documents · June 11, 1987
M. J. Shoger to J. K. Corrie and Others on Asbestos Enclosures and HWP Requirements Meeting (1987)
Internal Union Carbide memo announcing a June 19 meeting, sponsored by Chuck Rotthoff, with Institute, South Charleston and Sistersville personnel on plant practices for enclosures used in asbestos removal. It states there were two close calls…
-
Company document · Union Carbide documents · May 6, 1987
S. B. Kovach to L. C. Stewart Transmitting SHARE Inspection Results, South Charleston Plant (1987)
Cover letter from the South Charleston Plant SHARE coordinator sending L. C. Stewart the findings of a May 6, 1987 SHARE safety/health inspection. The letter sets a 90-day deadline to address deficiencies and requires 30-day progress updates. The…
-
Company document · Union Carbide documents · September 1, 1987
T. G. Huff to J. F. Dodd and Others, Project Scope Document for Building 303 Demolition, Phase III, South Charleston Plant (1987)
Project scope document for the second-stage demolition of Building 303 at the South Charleston plant, to clear space for truck trailers serving the new Drumming Center. It describes the phased work and the removal of asbestos pipe insulation and…
-
Company document · Union Carbide documents · September 3, 1987
S. B. Kovach to S. J. Chanley transmitting South Charleston Plant SHARE Inspection Results, with Distribution Department audit report (1987)
A September 3, 1987 cover letter from the South Charleston Plant SHARE coordinator to S. J. Chanley transmitting findings of a SHARE inspection, stating that deficiencies must be addressed within 90 days and progress updates sent every 30 days. The…
-
Company document · Union Carbide documents · September 1, 1987
T. G. Huff to D. J. McNeil and Others: Project Scope Document for B-303 Transitional Operation/Demolition Phase II, South Charleston Plant (1987)
Project scope document for Building 303 transitional operation and demolition at the South Charleston Plant. It describes temporary drum-handling facilities and the removal and disposal of asbestos-containing transite siding by an abatement…
-
Company document · Union Carbide documents · June 10, 1987
S. B. Kovach to R. W. Decrease transmitting SHARE Inspection Results, South Charleston Plant (1987)
Cover letter from the South Charleston Plant SHARE coordinator sending the findings of a SHARE inspection held June 10, 1987, and setting goals of addressing all deficiencies within 90 days and sending progress updates every 30 days. The attached…
-
Company document · Union Carbide documents · July 29, 1987
S. B. Kovach to T. G. Swanson Transmitting SHARE Inspection Results, with Audit Team Reports, South Charleston Plant (1987)
Cover letter from the SHARE Coordinator at the South Charleston Plant to T. G. Swanson transmitting findings of a SHARE inspection held July 29, 1987. It sets a 90-day deadline to address deficiencies and 30-day progress updates. Three attached…
-
Company document · Union Carbide documents · February 24, 1987
W. J. Vincent to All Department Heads on Labelling of Asbestos Materials, with Standard Practice SH-256 on Removal and Handling of Asbestos-Containing Insulation (1987)
A February 1987 internal memo from the South Charleston Plant Safety and Health Department told department heads that asbestos warning labels were now required on installed asbestos products whenever feasible and gave the supplier and cost. Attached…
-
Company document · Union Carbide documents · August 10, 1984
D. B. Howard to R. H. Stodghill and D. R. Stokely on Winter Preparations for Silicones II (1984)
Area 5 Maintenance internal correspondence asking the Silicones II staff to list equipment repairs, insulation work and facility repairs needed to prepare for winter. The memo said maintenance would then prepare a Ghant chart of expected completion…
-
Company document · Union Carbide documents · September 30, 1987
S. B. Kovach to L. C. Stewart Transmitting SHARE Inspection Results, South Charleston Plant (1987)
Cover letter from the South Charleston Plant SHARE coordinator sending L. C. Stewart the findings of a SHARE inspection held September 30, 1987. It sets the program goals of addressing all deficiencies within 90 days and sending progress updates…
-
Company document · Union Carbide documents · July 22, 1987
S. B. Kovach to D. R. Stokely Transmitting SHARE Inspection Results, South Charleston Plant (1987)
Cover letter from the South Charleston Plant SHARE Coordinator sending D. R. Stokely the findings of a SHARE inspection held July 22, 1987, and setting program goals for correcting deficiencies. It has a 30/60/90-day progress update block and…
-
Company document · Union Carbide documents · August 12, 1987
S. B. Kovach to D. H. Ott Transmitting SHARE Inspection Results, with Audit Team's Report for Polyols Insulation (1987)
Cover letter from the South Charleston Plant SHARE Coordinator to D. H. Ott forwarding findings from the SHARE inspection of August 12, 1987. It sets goals of addressing deficiencies within 90 days and sending 30-day progress updates, and includes a…
-
Company document · Union Carbide documents · February 11, 1987
W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement Questions, South Charleston Plant (1987)
Internal Union Carbide memo from W. J. Vincent to J. K. Corrie, stamped received by the Maintenance Department on Feb. 17, 1987, forwarding answers to questions on asbestos raised at a recent meeting on asbestos abatement…
-
Company document · Union Carbide documents · August 23, 1987
T. G. Huff to S. W. Drake and Others: Project Scope Document for B-303 Demolition and Transite Siding Removal, South Charleston Plant (1987)
Project scope document for demolishing part of Building 303 at the South Charleston Plant and replacing asbestos-containing transite siding on the Chemical Mixing Unit Slurry Bay with insulated metal panels. It sets out mechanical, electrical and…
-
Company document · Union Carbide documents · November 7, 1986
J. F. Dodd to D. A. Gosselin and Others Transmitting the South Charleston Plant Insulation Asbestos Upgrade Outline of Project (1986)
Cover memo dated November 7, 1986 transmitting for review an Outline of Project for a plantwide asbestos insulation upgrade at the South Charleston, WV plant, described as a high-priority Safety/Health Program. The attached outline describes the…
-
Company document · Union Carbide documents · October 3, 1986
W. J. Vincent to C. H. Hancock on Equipment Needs for Asbestos Monitoring (1986)
Memo from W. J. Vincent to C. H. Hancock reviewing the Industrial Hygiene Group's needs under the new asbestos standards (1910.1001 and 1926). It states that technicians counting fibers by the NIOSH 7400 method must be trained and certified, that…
-
Company document · Union Carbide documents · March 6, 1987
D. R. Stokely to R. G. Link Transmitting Action Plan Update on 514 Chemical Mixing Department Safety/Health Survey, with Asbestos Insulation Items (1987)
A one-page transmittal memo from D. R. Stokely to R. G. Link, copied to ten others, attaches an update on the action plan responding to the July 1985 operational safety/health survey of Plant 514 (Chemical Mixing Department). The two attached pages…