No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

33 results for “Union Carbide Corporation”, page 1 of 2

  1. Company document · Union Carbide documents · January 7, 1985

    J. R. Dean Staffing Analysis for Insulator Repair Work and Asbestos Repair, with Handwritten 1984 Overtime Table (1985)

    Typed worksheets dated 1/7/85 and signed 'J. R. Dean:mb' estimate insulator staffing needs, based on man-hours for insulation removal and replacement. They compare the result with current staffing and recommend bidding 11 insulators and contracting…

  2. Company document · Union Carbide documents · March 25, 1987

    J. K. Corrie to Maintenance Staff Transmitting Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)

    A March 25, 1987 cover memo from J. K. Corrie circulating a final review draft of Maintenance Safety Procedure XVIII, Asbestos Handling, for the South Charleston plant, with comments requested by April 3, 1987. The attached 20-page draft (dated…

  3. Company document · Union Carbide documents · June 28, 1985

    W. C. Young to Plant Managers Department on Asbestos Exposure Effects and Potential of Non-Insulator Crafts, with Plant 514 Asbestos Dust Measurement Printouts (1985)

    Internal memo of June 28, 1985 from the South Charleston Plant to the Managers Department stating that plant asbestos dust measurements were below OSHA limits, but the writer questioned whether any level of inhalation exposure is safe without…

  4. Company document · Union Carbide documents · August 14, 1984

    J. J. Ashworth to J. R. Dean on Winterization Lists for Area 2, South Charleston Plant, with Needed Insulation Work Lists (1984)

    A one-page internal memo from J. J. Ashworth asks Area 2 operations department heads for winterization lists by 8-24-84 to prevent freeze-ups like those of 1983-84. It is followed by lists of needed pipe and equipment insulation work for several…

  5. Company document · Union Carbide documents · December 17, 1986

    R. L. Foster to Distribution on Reissuing EPA Asbestos Removal Notification Reminder, with 1984 Memorandum and Notification Forms (1986)

    …13, 1984 Union Carbide memo clarifying prior notification for renovation of friable asbestos, with blanket notification form letter (Form C) Law Department memo on notification of demolition or renovation of friable asbestos material under 40 CFR…

  6. Company document · Union Carbide documents · February 25, 1985

    I. L. Beckett to W. E. Ballard et al. on Minutes of the Asbestos Insulation Replacement Project, Phase I Meeting, South Charleston Plant (1985)

    Memorandum giving minutes of a February 21, 1985 meeting on a project to repair and replace asbestos insulation at the South Charleston Plant. It records the 1985 funding limit, the choice of six departments to start with, the plan to use…

  7. Company document · Union Carbide documents · September 1, 1987

    T. G. Huff to J. F. Dodd and Others, Project Scope Document for Building 303 Demolition, Phase III, South Charleston Plant (1987)

    Project scope document for the second-stage demolition of Building 303 at the South Charleston plant, to clear space for truck trailers serving the new Drumming Center. It describes the phased work and the removal of asbestos pipe insulation and…

  8. Company document · Union Carbide documents · April 1, 1987

    Dennis H. Hanshew to J. K. Corrie on Review of Maintenance Safety Procedure XVIII, Asbestos Handling (1987)

    Memo in which the Environmental Protection Department reviewed the South Charleston Plant's Asbestos Handling Procedure (Maintenance Safety Procedure XVIII) and gave two comments. It asked that "and signed" be deleted from a sentence on page 16 and…

  9. Company document · Union Carbide documents · January 2, 1985

    J. L. Worstell to EPA Region III Regional Administrator, Notice of Asbestos Removal and Disposal at South Charleston Plant (1985)

    …EPA Region III Regional Administrator, under 40 CFR §61.146, that Union Carbide planned renovation and/or demolition at its South Charleston, West Virginia facilities from January 1 to December 31, 1985. It stated that the…

  10. Company document · Union Carbide documents · September 1, 1987

    T. G. Huff to D. J. McNeil and Others: Project Scope Document for B-303 Transitional Operation/Demolition Phase II, South Charleston Plant (1987)

    Project scope document for Building 303 transitional operation and demolition at the South Charleston Plant. It describes temporary drum-handling facilities and the removal and disposal of asbestos-containing transite siding by an abatement…

  11. Company document · Union Carbide documents · August 2, 1977

    J. L. Worstell to EPA Region III (S. R. Wassersug) Transmitting Asbestos Demolition/Renovation Notification, South Charleston Plant (1977)

    Letter from the South Charleston Plant's environmental protection coordinator to the EPA Region III enforcement director transmitting a notification about demolition and/or renovation of facilities with friable asbestos insulation. The letter says…

  12. Company document · Union Carbide documents · February 20, 1986

    J. L. Worstell to EPA Region III Regional Administrator, Notice of Asbestos Removal and Disposal at South Charleston Plant (1986)

    …notifying the EPA Regional Administrator, Region III, that Union Carbide planned to remove 2,500 linear feet of friable asbestos pipe insulation at its South Charleston, West Virginia plant between March 1 and March 31, 1986…

  13. Company document · Union Carbide documents · July 6, 1987

    Memo to J. R. Soice on Alternate Asbestos Disposal Site Bids, South Charleston Plant (1987)

    Internal memo summarizing responses to solicitations of bids from seven companies for asbestos disposal. It lists the Browning-Ferris (Marietta, Ohio), E.R.O. Landfill and Don's Disposal (Craigs Branch Landfill) sites, with prices and permit status,…

  14. Company document · Union Carbide documents · August 23, 1987

    T. G. Huff to S. W. Drake and Others: Project Scope Document for B-303 Demolition and Transite Siding Removal, South Charleston Plant (1987)

    Project scope document for demolishing part of Building 303 at the South Charleston Plant and replacing asbestos-containing transite siding on the Chemical Mixing Unit Slurry Bay with insulated metal panels. It sets out mechanical, electrical and…

  15. Company document · Union Carbide documents · November 7, 1986

    J. F. Dodd to D. A. Gosselin and Others Transmitting the South Charleston Plant Insulation Asbestos Upgrade Outline of Project (1986)

    Cover memo dated November 7, 1986 transmitting for review an Outline of Project for a plantwide asbestos insulation upgrade at the South Charleston, WV plant, described as a high-priority Safety/Health Program. The attached outline describes the…

  16. Company document · Union Carbide documents · September 11, 1986

    Internal Memo to J. L. Worstell and R. J. Romagnoli on Asbestos and Spent Solvent Disposal at Goff Mountain Landfill (1986)

    Internal Union Carbide memo dated September 11, 1986, on environmental protection, addressed to "Jack & Ron" with copies to F. L. Boggs and L. H. DuPuy. It says the Goff Mountain Landfill was close to banning asbestos…

  17. Company document · Union Carbide documents · March 27, 1987

    Memo to J. L. Worstell on Possibility of Using the Sistersville Plant for Asbestos Disposal (1987)

    Memo summarizing a telephone call to Bob Newberger, an Environmental Protection staff member at the Sistersville facility, about using that facility to dispose of waste asbestos. It reports how Sistersville handled its own asbestos waste and that…

  18. Company document · Union Carbide documents · April 17, 1985

    I. L. Beckett to J. F. Dodd and Others on Project Scope for Safety/Health Insulation, No. 2 Powerhouse, Building 151 (1985)

    Memorandum setting out a project scope for removing, replacing or sealing deteriorated asbestos insulation in the No. 2 Powerhouse (Building 151) at South Charleston, West Virginia. It describes the capital and removal work, safety and environmental…

  19. Company document · Union Carbide documents · March 25, 1987

    J. K. Corrie to J. R. Dement and Others Circulating Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)

    …with handwritten routing note dated 3-25-87 and comments signed Bob Hull (UCC 019705) Clean copy of the same Corrie transmittal memo on Union Carbide Specialty Chemicals Division letterhead (UCC 019706) Maintenance Safety Manual XVIII…

  20. Company document · Union Carbide documents · April 21, 1986

    J. L. Worstell Re-issuing Two Letters on EPA Asbestos (NESHAP) Regulations at the South Charleston Plant (1986)