26 results for “Union Carbide Corporation”, page 1 of 2

  1. Company document · Union Carbide documents · March 25, 1987

    J. K. Corrie to Maintenance Staff Transmitting Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)

    A March 25, 1987 cover memo from J. K. Corrie circulating a final review draft of Maintenance Safety Procedure XVIII, Asbestos Handling, for the South Charleston plant, with comments requested by April 3, 1987. The attached 20-page draft (dated…

  2. Company document · Union Carbide documents · September 2, 1987

    L. S. Magelssen and H. W. Wegert to J. F. Dodd et al. on Status of Contingency Items for Asbestos Insulation Removal Upgrade, South Charleston (1987)

    Two-page memorandum reporting that two contingency items attached to the May 19, 1987 health, safety and environmental endorsement of the South Charleston Asbestos Insulation Removal Upgrade-Phase I had been resolved. It discusses review of the…

  3. Company document · Union Carbide documents · December 17, 1986

    R. L. Foster to Distribution on Reissuing EPA Asbestos Removal Notification Reminder, with 1984 Memorandum and Notification Forms (1986)

    …13, 1984 Union Carbide memo clarifying prior notification for renovation of friable asbestos, with blanket notification form letter (Form C) Law Department memo on notification of demolition or renovation of friable asbestos material under 40 CFR…

  4. Company document · Union Carbide documents · September 1, 1987

    T. G. Huff to J. F. Dodd and Others, Project Scope Document for Building 303 Demolition, Phase III, South Charleston Plant (1987)

    Project scope document for the second-stage demolition of Building 303 at the South Charleston plant, to clear space for truck trailers serving the new Drumming Center. It describes the phased work and the removal of asbestos pipe insulation and…

  5. Company document · Union Carbide documents · October 30, 1986

    H. W. Wegert and G. M. Whipple to J. R. Dement and Others on Health, Safety and Environmental Review of the South Charleston Insulation Upgrade Project (1986)

    Memorandum reporting a health, safety and environmental review of a three-year project to remove, replace and seal asbestos insulation at the South Charleston Plant. It recommends endorsement contingent on revising Maintenance Procedure XVIII to…

  6. Company document · Union Carbide documents · April 1, 1987

    Dennis H. Hanshew to J. K. Corrie on Review of Maintenance Safety Procedure XVIII, Asbestos Handling (1987)

    Memo in which the Environmental Protection Department reviewed the South Charleston Plant's Asbestos Handling Procedure (Maintenance Safety Procedure XVIII) and gave two comments. It asked that "and signed" be deleted from a sentence on page 16 and…

  7. Company document · Union Carbide documents · October 30, 1986

    H. W. Wegert and G. M. Whipple to J. R. Dement et al. on Health, Safety, and Environmental Review of the South Charleston Insulation Upgrade Project (1986)

    Memorandum reporting a health, safety and environmental review of a three-year project to upgrade asbestos insulation at the South Charleston Plant. It recommended endorsement contingent on revising Maintenance Procedure XVIII to comply with the…

  8. Company document · Union Carbide documents · September 1, 1987

    T. G. Huff to D. J. McNeil and Others: Project Scope Document for B-303 Transitional Operation/Demolition Phase II, South Charleston Plant (1987)

    Project scope document for Building 303 transitional operation and demolition at the South Charleston Plant. It describes temporary drum-handling facilities and the removal and disposal of asbestos-containing transite siding by an abatement…

  9. Company document · Union Carbide documents · July 6, 1987

    Memo to J. R. Soice on Alternate Asbestos Disposal Site Bids, South Charleston Plant (1987)

    Internal memo summarizing responses to solicitations of bids from seven companies for asbestos disposal. It lists the Browning-Ferris (Marietta, Ohio), E.R.O. Landfill and Don's Disposal (Craigs Branch Landfill) sites, with prices and permit status,…

  10. Company document · Union Carbide documents · August 23, 1987

    T. G. Huff to S. W. Drake and Others: Project Scope Document for B-303 Demolition and Transite Siding Removal, South Charleston Plant (1987)

    Project scope document for demolishing part of Building 303 at the South Charleston Plant and replacing asbestos-containing transite siding on the Chemical Mixing Unit Slurry Bay with insulated metal panels. It sets out mechanical, electrical and…

  11. Company document · Union Carbide documents · November 7, 1986

    J. F. Dodd to D. A. Gosselin and Others Transmitting the South Charleston Plant Insulation Asbestos Upgrade Outline of Project (1986)

    Cover memo dated November 7, 1986 transmitting for review an Outline of Project for a plantwide asbestos insulation upgrade at the South Charleston, WV plant, described as a high-priority Safety/Health Program. The attached outline describes the…

  12. Company document · Union Carbide documents · October 3, 1986

    W. J. Vincent to C. H. Hancock on Equipment Needs for Asbestos Monitoring (1986)

    Memo from W. J. Vincent to C. H. Hancock reviewing the Industrial Hygiene Group's needs under the new asbestos standards (1910.1001 and 1926). It states that technicians counting fibers by the NIOSH 7400 method must be trained and certified, that…

  13. Company document · Union Carbide documents · August 23, 1976

    B. L. Murray to J. H. Murray on Potential Asbestos Exposure from South Charleston Plant Storeroom Materials, with Attached Data Sheet and Plant Stores Sampling Report (1976)

    …H. Murray on potential asbestos exposure in plant storerooms (Buildings 307-1 and 8-505) Union Carbide Chemicals and Plastics Division Environmental Health Data Sheet for asbestos (chrysotile), South Charleston Plant Industrial hygiene memo dated July…

  14. Company document · Union Carbide documents · September 11, 1986

    Internal Memo to J. L. Worstell and R. J. Romagnoli on Asbestos and Spent Solvent Disposal at Goff Mountain Landfill (1986)

    Internal Union Carbide memo dated September 11, 1986, on environmental protection, addressed to "Jack & Ron" with copies to F. L. Boggs and L. H. DuPuy. It says the Goff Mountain Landfill was close to banning asbestos…

  15. Company document · Union Carbide documents · May 6, 1987

    D. H. Hanshew to J. R. Dement on Environmental Concerns about the South Charleston Plant Insulation Upgrade Project and Asbestos Handling Procedure (1987)

    Memo responding to a 10-30-86 memo from H. W. Wegert and G. M. Whipple about the Health, Safety, and Environmental Review of the South Charleston insulation upgrade project. It addresses three concerns about notification, disposal container labels…

  16. Company document · Union Carbide documents · May 19, 1987

    L. S. Magelssen and H. W. Wegert to J. R. Dement and Others on Health, Safety and Environmental Review of the South Charleston Asbestos Insulation Removal Upgrade, Phase I (1987)

    A May 19, 1987 memo recommending endorsement of Phase I of a project to remove and upgrade asbestos insulation at the South Charleston plant. The endorsement is contingent on revising Maintenance Procedure XVIII to comply with OSHA 29 CFR 1926.58…

  17. Company document · Union Carbide documents · March 27, 1987

    Memo to J. L. Worstell on Possibility of Using the Sistersville Plant for Asbestos Disposal (1987)

    Memo summarizing a telephone call to Bob Newberger, an Environmental Protection staff member at the Sistersville facility, about using that facility to dispose of waste asbestos. It reports how Sistersville handled its own asbestos waste and that…

  18. Company document · Union Carbide documents · April 17, 1985

    I. L. Beckett to J. F. Dodd and Others on Project Scope for Safety/Health Insulation, No. 2 Powerhouse, Building 151 (1985)

    Memorandum setting out a project scope for removing, replacing or sealing deteriorated asbestos insulation in the No. 2 Powerhouse (Building 151) at South Charleston, West Virginia. It describes the capital and removal work, safety and environmental…

  19. Company document · Union Carbide documents · March 25, 1987

    J. K. Corrie to J. R. Dement and Others Circulating Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987)

    …with handwritten routing note dated 3-25-87 and comments signed Bob Hull (UCC 019705) Clean copy of the same Corrie transmittal memo on Union Carbide Specialty Chemicals Division letterhead (UCC 019706) Maintenance Safety Manual XVIII…

  20. Company document · Union Carbide documents · September 2, 1987

    L. S. Magelssen and H. W. Wegert to J. F. Dodd and Others on Status of Contingency Items for Asbestos Insulation Removal Upgrade, South Charleston (1987)

    Memorandum reporting that two contingency items attached to the May 19, 1987 endorsement of the South Charleston asbestos insulation removal upgrade (Phase I) had been resolved. It says the February 1987 asbestos maintenance procedures were reviewed…